Jump to Project:
04-3J080 Petaluma Boulevard South - San Antonio Creek Bridge Scour Mitigation Project (Mitigation)
04-4J990 Ritchie Creek Bridge Replacement Project
04-Napa-128 Culvert Replacement at Lake Hennessey
100 Brighton Avenue Armoring
108 Brookside Culvert Repair
125 Fox Hollow Road Bank Repair - Bear Gulch Creek, Woodside
12th Street Reconstruction Project
1701 Brookside Drive Creek Bank Repair
1810 Brookvale Road Project
2010 Habitat Reserve Program - Alameda Watershed Projects
2010 Mission Bay Harbor Eelgrass Mitigation Project
2020 Depth of Cover Repair
2022 Ignacio-Mare Island Phase 2 Emergency Tower Replacement Prj
20 & 40 Hilton Court Slide Repair
2209 Bayside Drive Eelgrass Mitigation Project
2210 Channel Road Eelgrass Survey
2222 Channel Road Dock Eelgrass Survey
280 Indian Road Landscaping & Drainage Improvement
310-330 Esplanade Infrastructure Preservation Project
3680 Las Colinas Wetland Restoration
36 Glenwood Avenue Habitat Improvements
36-Inch Raw Water Pipeline Replacement Project
400 Esplanade Infrastructure Preservation Project
40 Acres Homeowners Water Association Diversion Replacement Project
40 Montezuma Creek Bank Restoration
42 Valley Drive Bank Stabilization
42 Valley Drive San Pablo Creek Bank Stabilization
4J850_Los Trancos Creek Bridge Seismic Retrofit_ San Mateo 280
5557 Sorrento Drive Eelgrass Survey
591 and 575 Embarcadero Eelgrass and Caulerpa Survey
66-Inch Trunk Sewer Rehabilitation
777 Airport Boulevard
805 South Phase 1
Accornero Wetland Restoration (WCB ID:2005075)
Acker Island
Ackerson Meadow Restoration Project
Adaptation and Resilience Plan for the Petaluma River Baylands
Adobe Creek Bank Stabilization at 25550 Moody Road Project
Adobe Creek Bank Stabilization Project / Redwood Grove Bank Stabilization Project
Adobe Creek Habitat Restoration and Sediment Removal
Adobe Creek Upper Reach 5 Restoration Project
Adobe Gulch Creek Bioregional Habitat Restoration Site
Adobe Gulch Grasslands Bioregional Habitat Restoration Site
ADVANCING RESTORATION STRATEGIES FOR HYDROLOGIC CONNECTIVITY IN WILLIAMS CREEK
Ady Canal Recirculation
After The Fact Celebrations Development
Agua Chinon Retarding Basin
Agua Hedionda Caulerpa Taxifolia Eradication Program
Agua Hedionda Lagoon Eelgrass Mitigation Project
Agua Hedionda Outer Lagoon Eelgrass Mitigation Project
Agua Hedionda Sewer Line Bridge Removal and Replacement
Ahmann River Front Parcel Piling Removal/Reinstallation and Dock Project
Alameda Creek Bridge Replacement Project
Alameda Creek Diversion Dam Fish Passage
Alameda Creek Fisheries Restoration
Alameda Creek Fish Screens at ACWD Diversions
Alameda Creek Flood Control Channel - Rubber Dam No. 1 and Drop Structure Fishway Project
Alameda Creek Flood Control Channel Structures
Alameda Creek Flood Control Low-Flow Channel
Alameda Creek Little Yosemite Fish Passage
Alameda Creek Niles and Sunol Dam Removals
Alameda Creek Niles Gaging Station Barrier
Alameda Creek PG&E Pipeline Crossing
Alameda Creek Sunol Park Swim Dam Removals
Alameda Creek Upper Rubber Dam No. 3 Fish Ladder
Alameda Creek Watershed Center
Alameda Landing Waterfront Mixed-Use Development
Alameda Marina
Alameda Naval Air Station
Alameda Point
Alameda Point - Encinal Dune Restoration and Shoreline Stabilization
Alameda Point Restoration
Alameda Point - Site A, Phase 1
Alameda/San Antonio Creeks Sunol Mining Permit Lease Restoration
Alamitos Bay Marina Rehabilitation Eelgrass Mitigation Project
Alamitos Bay Oyster Restoration Project
Alamitos Channel Maintenance Project--North and South Reach--Los Alamitos, Orange County, CA
Alamitos Creek Bridge 37C0159 Replacement Project
Albany Beach Restoration and Public Access Project - McLaughlin Eastshore State Park
Albany Bulb Lagoon
Albany Marsh Expansion Feasibility Study
ALBA Wetland Restoration
Albion River Coho Habitat Enhancement Project – Large Wood Installation
Alder Creek Ranch Erosion Control Project
Alder Creek Trail 2022
Alegre Preserve
Alex Cook Ranch
Alhambra Creek Bank Stabilization
Alhambra Creek Restoration and Environmental Education Collaborative
Alhambra Creek Watershed Plan
Alhambra Highlands Mitigation
Alhambra Valley Creek Coalition Restoration Project
Alhambra Valley Road Bank Repair
Aliso Creek Bike Trail Repair Project
Aliso Creek Bikeway Bridge Repairs
Aliso Creek Estuary Restoration Plan
Aliso Creek Trail Repair Project
Alpine Creek Fish Passage
Alpine Road Bridge Repair Project
Alpine Road Embankment Project2
Alta Mira Shoreline Stabilization Project
Alvarado Trunk Sewer Phase III and IIIA Project
Alvarado Trunk Sewer Upgrade
Alviso Wetland Railroad Adaptation Alternative
Ameresco Keller Canyon Renewable Natural Gas Processing Facility and Pipeline Project
American Canyon Acquisition
American Canyon Creek Restoration
American Canyon Ecosystem Enhancement Project
American Canyon Wetlands Restoration Plan
Anaheim Bay Bridge Rock Slope Protection and Drainage Maintenance
Anaheim Bay Naval Weapons Station Eelgrass Mitigation Project
Andrew Molera State Park Big Sur Riparian Restoration
Angeles National Golf Course - Potential
Angora Creek Large Wood Restoration Project
Angora Creek Stream Environment Zone (SEZ) Restoration Project
Angora Creek Stream Restoration
Annie Creek Riparian Fencing
Ano Nuevo State Park
Anstine-Audubon Sediment Removal Project
Anthony Jaques Preserve
Antioch Dunes NWR - Dredged Sand Deposition of Stamm Unit - Dune Restoration
Appian Creek Stewardship Project
Aramburu Island Enhancement Project - Richardson Bay - Phase 1: Pre-construction monitoring, construction
Aramburu Island Enhancement Project - Richardson Bay - Phase 2: Construction
Aramburu Island Enhancement Project - Richardson Bay - Phase 3: Revegetation, monitoring, adaptive management
Arana Creek Restoration Project
Arastradero Preserve Restoration Project
Area 14 S-Drain Outlet
ARRA-Muddy Hollow Trail Improvements Project
Arroyo Burro Estuary
Arroyo Burro Estuary and Mesa Creek Restoration
Arroyo Corte Madera (Mill Valley)
Arroyo De La Laguna 1- Bay Division Reliability Upgrade Project (BDPL5)
Arroyo Hondo Creek Steelhead Passage Enhancement
Arroyo Hondo Culvert Modification Project
Arroyo Hondo Ranch Acquisition
Arroyo San Jose Emergency Bridge and Sewer Line Stabilization – Site 8
Arroyo Santa Rosa Levee Certification Repairs (ASR-2)
Arroyo Seco Creek Drainage Improvement Project
Arroyo Seco Improvement Program
Arroyo Trabuco Golf Course
Arroyo Viejo Creek Restoration at Arroyo Viejo Park
Arroyo Viejo Creek Restoration at Knowland Park/Oakland Zoo
Arroyo Viejo Creek Watershed Awareness Program
Asbury Creek Passage at Jack London Village
Ashford Village
Assessing Ocean Acidification in SF Bay Oyster and Eelgrass Beds
Atascadero and Maria Ygnacio Steelhead Restoration Implementation Project
Atascadero Creek Sedimentation Analysis and Fish Passage Restoration 65% Design Project
Auburn Ravine - Hemphill Diversion Assessment Phase 2
Audie Murphy Ranch Residential Development
Ausaymas Cattle Company and Hawkins Cattle Company Klamath Off-project Water Lease
Azaya Ranch Vineyard Project - Phase I and II
Azusa Canyon Wilderness Park
Badger Almond Wetland Enhancement (WCB ID:2016019)
BAE Systems Pier 1 Eelgrass Mitigation Project
Bagley Creek Phase II
Bahia Acquisition
Bahia Lagoon
Bahia Restoration Phase 1
Bahia Restoration Phase 2
Bahia Restoration Phase 3
Bailey Estates
Bair Island Acquisition
Bair Island Restoration
Bair Island SFO Mitigation
Balboa Island Grand Canal Eelgrass Mitigation Project
Balboa Marina Dock Replacement--Newport Beach, Orange County, CA
Balboa Marina Eelgrass Mitigation Project
Balboa Trunk Sewer Project
Ballona Wetlands Acquisition
Ballona Wetlands Restoration Planning
Bank/Bed Stabilization in Windmill Canyon (18 Area) on Camp Pendleton
Bank Stabilization in the Horno Ara on Marine Corps Base Camp Pendleton
Bank Stabilization--Laguna Settling Basin
Bank Stabilization Project in Camille Creek
Bank Stabilization Project in Tulucay Creek
Bank Stabilization Work on San Mateo Creek
Barham Drive Drainage
Barron Creek at 1018 Los Robles Avenue
Batiquitos Lagoon Mitsuuchi Acquisition
Baxter Creek Booker T. Anderson Park Project
Baxter Creek Gateway Project
Baxter Quarry Project
Bay Area Products Line, Sacramento Leg Repairs
Bay Area Rapid Transit District (BART) Warm Springs Extension
Bay Farm Island Project
Bayfront Park Tidal Wetland Restoration Project
Bayfront Park Wetlands Restoration Project
Baylands Habitat Restoration and Community Engagement Project
Bay Point Regional Shoreline - Restoration and Public Access Project
Bay Restoration: Youth Engagement and Service Learning
Bay Rise Park - 410 Airport Blvd (Burlingame Shoreline)
Bayside Business Park - December 2002
Bayside Business Park - Phase I
Bayside Business Park - Phase II
Bayview Hunters Point Shipyard
Beach Boulevard Infrastructure Resiliency Project
Beach Lake Mitigation Bank
Beaconsfield Canyon Restoration
Bean Creek
Bear Creek Canyon Road Association Storm-Proofing
Bear Creek Instream Habitat Enhancement Project
Bear Creek Lower Meadow Restoration
Bear Creek Sediment Reduction and Salmonid Recovery Project
Bear Gulch Upper Diversion Dam Maintenance
Bear Gulch Watershed Upslope Erosion Management Plan
Bear River Setback Levee
Bear Valley Road Bridge over the Mojave River Rehabilitation Project
Beck Preserve
Bedwell Bayfront Park Entrance Improvements Project
Bee Canyon Channel Maintenance
Bees Lakes Habitat Restoration Project
Belbrook Culvert Repair Project
Belden's Landing
Belle Maison at Chardonnay Hills
Bel Marin Keys V - Acquisition
Bel Marin Keys V Wetlands Restoration
Belmont Creek Maintenance Dredging
Belmont Creek Maintenance Dredging Project (2008)
Belmont Creek Maintenance Dredging Project (2011)
Belmont Creek Sediment Removal Project, City of Belmont
Belmont Pedestrian Overcrossing Project
Belvedere Lagoon Pump Station Improvements
Beneficial Reuse of Excavated Material in Tidal Marsh Restoration Project
Benner Creek
Benton Burn Site Remediation
Berkeley Brickyard - McLaughlin Eastshore State Park
Berkeley Marina Area Specific Plan
Berkeley Meadow - McLaughlin Eastshore State Park
Berkeley North Basin Strip - McLaughlin Eastshore State Park
Berkeley Pier-Ferry Project
Bernal Avenue Bridge and Road Widening Project
Bertagnolli Ranch Acquisition
Bethel Island 10 acre Site
Bhaskar Residence Matadero Creek
Biagi Distribution Center
Bidwell Creek Floodplain Enhancement Project
Big Basin Redwoods State Park Waddell Creek Restoration
Big Break Regional Shoreline Acquisition
Big Break Regional Shoreline - Wetland Restoration and Public Access
Big Canyon Country Club Pond Fill
Big Canyon Creek Restoration and Estuary Adaptation Project
Big Canyon Creek Restoration Plan
Big Flat Meadow
Big Meadows
Big Pine Canal at US 395 Bank Rehabilitation
Big Pine Memorial Path
Big River Salmonid Rearing Habitat and Large Wood Enhancement Project Designs
Billingsley Bed and Breakfast Conversion Project
Bio Architecture Lab Kelp Propagation Project
Biological Restoration and Monitoring in the Suisun Marsh/North San Francisco Bay Ecological Zone
Bitter Point Salt Marsh Acquisition
Blackhawk GHAD Hole 8 Slide Repair
Blacklock Restoration: Phragmites Control Study
Blacklock Restoration Project
Black Rock Creek
Black Rock Siphon Project
BMW Service Center Culvert Crossing
BNSF Crossing, MP 592.75
Bobcat Flat Phase III Restoration Project
Boca Dam Safety of Dams Modification Project
Boca Meadows Restoration
Bolinas Lagoon Ecosystem Restoration Project Overview
Bolinas Lagoon North End Wetland Enhancement/SLR Adaptation Project
Bolinas Lagoon Wye Wetlands
Bolinas Lagoon Wye Wetlands Resiliency Project
Bolinas Wye Wetlands Restoration & Resiliency Project
Bolsa Chica Lowlands Sea Level Rise Adaptation Project
Bolsa Chica Wetlands Restoration
Bonita Canyon Repairs
Borden Road And Bridge Project
Bothin Marsh
Bothin Marsh Enhancement
Bothin Marsh Restoration
Boulder Creek
Boulder Creek- Antelope
Boulder Heights
Bouquet Canyon Bridge Widening
Box Creek Restoration
Braddock & Logan-Fallon Village
Bradford Tract 19
Bradley Avenue/State Route (SR) 67 Interchange Project
Bradmoor Island and Arnold Slough Tidal Restoration Project
Brea Highlands Soil Remediation
Bremer Family Winery Corrective Action, Mitigation Implementation, and Bridge Installation
Brentwood Development - Storm Drain Project
Breuners Mitigation Bank
Bridge 243.0 Revetment Project - South Bridge Abutment Protection Plan
Briggs Road Improvement
Brightline West High Speed Rail Project
Briones Valley (Cowell Ranch)
Brisbane Area Shoreline Resilience Project
Brisbane Baylands
Brisbane Baylands Development
Bristol Cove Dredging Eelgrass Mitigation Project
Bristol Cove Sediment Removal Project
Brood Water and Wetland Enhancement, Beck Ranch (WCB ID:1993005)
Brookhurst Marsh Acquisition
Brooks Island Habitat Improvement Project
Brown's Valley Culvert Retrofit
Brushy Creek Conservation Bank
Brushy Peak Regional Preserve
BSL Watershed A mitigation
B Street Pier Mooring Dolphin Project
Buckman Springs Road and Oak Drive Intersection Improvements
Buena Vista Audubon Society Wetlands Reserve Restoration Project: 60% Design and Engineering
Buena Vista Creek Acquisition, Sherman Parcel
Buena Vista Creek Acquisition - Sherman Property
Buena Vista Creekwalk
Buena Vista Creek Watershed Plan
Buena Vista Lagoon Enhancement Project: 65% Design and Engineering Plans
Buena Vista Lagoon Restoration Plan, Feasibility Analysis
Buena Vista Lagoon State Ecological Reserve Restoration Planning - Phase II
Buie Communities
Bull Island
Bull Test (Beef Center) Sediment Basin Relocation
Burchell Family Trust Preserve
Bureau of Land Management Property C
Bureau of Land Management Property F
Burke Ranch Conservation Bank
Burlingame Annual Creek and Channel Maintenance Project
Burlingame Lagoon
Burton Bridge Crossing
Butano Creek Reconnection Project
Butano Floodplain
Butte Creek Diversion 55 Fish Screen Project
Butte Creek House Ecological Reserve Meadow Restoration Project
Butterfield Stage Road and Sewer Line
Butterfield Station Project
Butterfly Creek at Bosque del Rio Hondo Park
Byron Conservation Bank
Byron Vernal Pools Acquisition
Byron Vernal Pools Restoration
Cabin Meadows and Rock Fence Creeks Watershed Planning
Cabral Island
Cache Creek Bridge Replacement
Cache Slough Sac Bank Restoration
Cache Slough Shaded Riverine Aquatic Habitat Enhancement
CA ERFO DEVA 11(1) - Mitigation
CA FLAP INYCR2022(1) South Lake Road
Calabazas Creek - 2017 Nuns Fire Restoration
Calabazas Creek Bank Rehabilitation Project
Calabazas Creek Fish Passage at Dunbar Road
Calabazas Creek Flood Protection Project
Calabazas Creek Open Space Preserve
Calabazas/San Tomas Aquino Creek - Marsh Connection Project
Calcagno
Calf Pasture Meadow Restoration Project
Calhoun Cut Ecological Reserve/Lindsey Slough Tidal Habitat Restoration
California Department of Transportation Caldecott Tunnel Improvement Project
California Department of Transportation Conn Creek Slide Repair Project
Calistoga Napa River Restoration Project
CalNev Afton, Bailey, and Rasor Roads Washout Project
Caltrans Forrester & Worthington Rd
Caltrans French Valley Parkway
Caltrans I-805 at Rose Canyon Creek, San Diego, CA
CalTrans Mitigation Site
Caltrans: Salinas River Bridge Replacement
Camp 4 Ranch Acquisition and Restoration Project
Campbell Ranch Conservation Bank
Campbell Shipyard Remediation Eelgrass Mitigation Project
Campos Verdes Development
Camp Pendleton Seawater Desalination Technical Studies Project
Campus Park
Canal Ranch 2-Acre Site (1991 Repair)
Canal Ranch Attached Berm
Candlestick Point Stewardship Project (Phase 1 and 2)
Candlestick Point - Yosemite Slough Wetland Restoration
Can Duck Club
Cannell Meadow Restoration Project
Canyon Hills Phase 8, Lake Elsinore
Capistrano Fish Passage Restoration Project
Capri Creek Flood Reduction and Habitat Enhancement
Cardinal Road Levee Upgrade Project
Cargill Mitigation Marsh
Carlos Place Subdivision
Carlsbad Canterbury Desilting Basin Maintenance
Carlsbad Hydrologic Unit Riparian Habitat Restoration
Carman Watershed Restoration Project Phase 2
Carmel River De Dampierre Erosion Control Project
Carmen Creek- 3 Cornered Meadow
Carmen Creek- Knuthson Meadow
Carpinteria Creek
Carpinteria Creek Arundo Removal Project
Carpinteria Salt Marsh, Basin 1 Enhancement Plan
Carpinteria Salt Marsh, Basin 1 Implementation
Carquinez Bridge Seismic Retrofit Project
Carriger Creek Bridge Construction & Passage at Grove Street
Carriger Creek - Fish Passage
Carroll Creek Slope Protection
Cascade Canyon
Cascades Golf Course in Grapevine Creek
Castle and Round Valley Meadows Restoration Planning Project
Castro Cove
Castro Valley Creek Daylighting Project
Catellus Crossroads Business Park
Catellus Parcel
Cattle Canyon
Catwalk Repair at Poche Beach
Cayetano Creek Mitigation Bank
Cazadero Highway PM 14.41
Cazadero Highway PM 16.50
CDOT - DN 101 - Dr Fine Bridge Replacement, 01-43640
CDOT - DN, Highway 199, Inside Park Culverts
CDOT - East Cedar Pass
CDOT - Highway 101, Airport Blvd / Fulton Rd Interchange Modification Project
CDOT - Highway 101 - Eureka-Arcata Route 101 Corridor Improvement Project onsite and offsite mitigation
CDOT - Highway 101 High Occupancy Vehicle (HOV) Lane Widening and Improvements: Steele Lane to Windsor River Road Project
CDOT – Highway 101/Highway 36, Alton Interchange
CDOT - Highway 101 Little Lost Man Creek Fish Passage Project
CDOT - Highway 101, Mad River Bridges Replacement Project
CDOT - Highway 101, Mendocino County Culvert Rehabilitation Project
CDOT - Highway 101, Rio Dell Roadway Rehabilitation
CDOT – Highway 101, Smith River Left Turn Lane and Shoulder Widening
CDOT - Highway 128 and 253 – Culvert Rehabilitation Project Phase 1
CDOT - Highway 128 and 253 – Culvert Rehabilitation Project Phase 2
CDOT - Highway 128 PM 14.30—49.28 Culvert Rehab 55 Culverts in Mendocino County
CDOT - Highway 128 Smoot Sink Storm Damage Repair Project
CDOT - Highway 12, Laguna de Santa Rosa Bridge Replacement Project
CDOT – Highway 161, Lost River Bridge Replacement
CDOT - Highway 1 - Greenwood Creek Bridge Replacement Project
CDOT - Highway 1 – Navarro Bluffs Retreat Project
CDOT - Highway 1 – Storm Damage Repair (Warren Creek Culvert) PM 40.13 Project
CDOT - Highway 20 and 1 – Culvert Rehabilitation Project
CDOT - Highway 20 - Camp 20 Safety Project
CDOT - Highway 20 Post Mile 0.3-2.4 Left Turn Lane and Shoulder Widening
CDOT - Highway 222 Russian River Bridge Replacement
CDOT - Highway 253 – Gino’s Wall
CDOT - Highway 299 – China Slide Safety Project
CDOT - Highway 299 – Green Point Sink Project
CDOT - Highway 3 – Hayfork Bike Lane Project
CDOT - Highway 96 – Ukonom Culvert Rehabilitation Project
CDOT - HUM 101 - Culvert Rehab/Replace Project
CDOT - HUM,101, Drainage South Project (EA: 01-0H640)
CDOT - HUM 101/MEN 271 Culverts, 01-48770
CDOT HUM 299 Culverts 01-0F620
CDOT – HUM, Highway 101, Five Culverts Near Garberville
CDOT - HUM, Highway 101, South Fork Eel Bridge Seismic Retrofit
CDOT - HUM, Highway 254 - Phillipsville Culverts
CDOT - HUM, Highway 299, HUM 299 Curve Improvement Project
CDOT - HUM, State Route 36, Three Bridges Project
CDOT - HUM, US 101, (EA:01-48410) Five Culverts Near Garberville
CDOT - LAS, State Route 44, Shalas CAPM
CDOT - Maacama/ Redwood Creek Bridge
CDOT - MEN 101 - Culvert Rehabilitation Project, 01-0K520
CDOT - MEN 101 - Mendo Inlet Drainage Project, 01-0J340
CDOT MEN 162 Eel River Bridge Replacement 01-0A131
CDOT - MEN 1 -Cleone Shoulder Widening, 01-0G600
CDOT MEN 1 Emergency Sinkhole Culvert Repair PM 84.83
CDOT - MEN 1 - Navarro Drainage, 01-0E940
CDOT - MEN 1 - Navarro Safety, 01-0C550
CDOT - MEN 1- Pudding Creek Bridge, 01-43480
CDOT - MEN 20 - Calpella 2 Bridges 01-0E090
CDOT - MEN, Highway 020, Camp 20 Safety Project
CDOT - MEN, Highway 101/Highway 271 Culverts Project
CDOT - MEN, Highway 128 - Culvert Replacement
CDOT – MEN, Highway 1, Elk Creek Bridge Replacement
CDOT - MEN, Highway 1 - Rockport 5 Culverts
CDOT - Route 1 Realignment Project From PM 10.7-11.3
CDOT- SIS, Highway 263, Klamath River Bridge Replacement Project
CDOT - SIS, Highway 96, Cade and Portuguese Creek Fish Passage Project
CDOT – SIS, Highway 96, Cade & Portuguese Fish Passage
CDOT - SIS, Highway 96, Culverts
CDOT - SIS, Highway 96, Horse Creek Bridge Replacement
CDOT – SIS, Highway 96, Oakbar Culverts
CDOT - SON, Highway 116, Left Turn and Merge
CDOT - State Route 101, Del Norte Culvert and Drainage Repairs
CDOT - State Route 101 Lagoon Slip & Slide Storm Damage Repair Project
CDOT - State Route 101 Peregrine Slides Repair Project
CDOT - State Route 101 – Seaside Beach Storm Damage Repair Project
CDOT - State Route 128/253 Culvert Rehabilitation Project (Phase III, Part 2)
CDOT - State Route 128 Culvert Rehabilitation Project (Phase 3)
CDOT - State Route 1 Anchor Bay Downdrain Reconstruction Project
CDOT - State Route 1 Estero Americano Bridge Replacement Project
CDOT - State Route 299 Lupton Curve Improvement Project
CDOT - TRI - 299 - Trinity Culverts Project
CDOT - TRI 3 - Hayfork Mountain Culvert, 02-0J500
CDOT - TRI, Highway 003, Hayfork Grade Culverts
CDOT - TRI, Highway 36, Ditch Gulch Curve Improvement Project
CDOT - TRI - Highway 3, Hayfork Culvert 2
CDOT - TRI, Tidy Waters
Cedar Creek Habitat Restoration and Passage Improvement Design Project
Cedar Street Drainage Project
Central Avenue Marsh
Central Avenue Marsh - Albany Sequel
Cerrito Creek - El Cerrito Plaza
Cerrito Creek - Pacific East Mall
Cerrito Creek - San Pablo west to Pacific East Mall
Cerritos Bahia Marina Eelgrass Mitigation Project
Cesar Chavez Community Park
Chabot Watershed Partnership: Habitat Restoration and BMPs for Water Quality in an Impaired Urban Watershed
Champlin Creek
Champs Flat and McCoy Flat - Climate-Informed Meadow Restoration to Support Eagle Lake Rainbow Trout Recovery
Channel Shoals Eelgrass Mitigation Project
Chapman Fencing Project
Charleston Slough Tidal Marsh Restoration Project
Chelsea Wetlands
Chevron Point Cross Levee
Chickahominy Creek Habitat Restoration (WCB ID:2008054)
Childs Meadow Restoration Project
China Basin Park (Mission Rock Development)
China Camp State Park Road Adaptation and Tidal Marsh Enhancement
Chipps Island
Chocktoot Ranch Spring Enhancement and Aspen Stand Improvement
Chorro Creek @ Camp SLO
Chorro Creek @ Canet Road
Chorro Creek Cattle Exclusion Project
Chorro Creek Restoration and Management Plan for Camp SLO
Chorro Flats Instream Habitat Improvement Project
Chromium Mine
Chumash Creek Watershed Enhancement Project
Circle K Convenience Store Development - Mitigation
Citation Marsh
Citracado High School
City of Benicia Urban Waterfront Enhancement and Master Plan
City of Emeryville Point Emery Shoreline Protection Project
City of Fremont - Agua Caliente Creek Restoration Project
City of Fremont - Zone 6 Lines N, N-1 Maintenance Project
City of Pittsburg - Widening of California Ave
City of Pleasanton Stream and Pond Maintenance Project
City of Pleasanton Stream and Pond Maintenance Project - Habitat Mitigation and Monitoring Plan
City of San Diego MWWD/Sewer System Cany
City of San Diego Storm Water Department/Tijuana River Valley Pilot Channel Maintenance
City of San Jose - Watson Park Remedial Action Plan, Phase 1
City of San Marcos - Storm Water Facility Maintenance Program
City of San Mateo - Bayfront Levee Improvements Project
City of Santa Barbara Arroyo Burro Open Space- Floodplain Restoration
City of Santa Rosa Farms Creek Restoration
Citywide Outfall Rehabilitation Projects
Claremont Creek
Clarks Creek
Cleghorn Effluent Force Main (Silverwood Lake SRA)
Clinton Basin Wetlands Enhancement
Clinton Keith Residential Development
Coal Oil Point Reserve Coastal Access and Habitat Restoration
Coastal San Mateo County Drought Relief Program (Phase II)
Coast Guard Mooring Corona del Mar Eelgrass Mitigation Project
Cochran Creek (Humboldt Bay) Fish Passage and Habitat Rehabilitation Implementation Project
Codornices Creek Bank Stabilization Project
Codornices Creek - Kains to San Pablo
Codornices Creek - lower (San Pablo Ave. west)
Codornices Creek Restoration - Nagai Property
Codornices Creek - upper
Codornices Creek Watershed Restoration Action Plan -- Phase I
Codornices Creek Watershed Restoration Action Plan -- Phase II
Cody Meadow Restoration
Cogswell Marsh
Cold Creek Enhancement Plan and Acquisition
Coldstream Canyon Restoration Project
Coldstream Canyon Sediment Reduction and Wetland Rehabilitation
Coldstream Lower Floodplain Enhancement Project
Coletta Dock Access Dredge Project John
Collier Avenue Widening Project
Collier Canyon Mitigation Preserve (SR-84 Widening and SR-84/I-680 Interchange Improvement Project)
Colma Creek Adaptation
Colma Creek Flood Control Channel Wall Repair Project
Colma Creek Flood Control Maintenance Project
Colma Creek Mitigation
Colorado Lagoon Restoration
Color Spot
Colusa NWR - Tract 110
Colusa NWR - Tract 112
Colusa NWR - Tract 113
Colusa NWR - Tract 201
Colusa NWR - Tract 210
Colusa NWR - Tract 30
Communication Systems Upgrade (P-1093)
Communication Upgrade (P-1093) Stage 1
Community-Based Restoration and Stewardship - Bothin Marsh
Community-Based Restoration and Stewardship - Creekside Marsh
Community-Based Restoration and Stewardship - Eden Landing Ecological Reserve
Community-Based Restoration and Stewardship - Faber-Laumeister Tract
Community-Based Restoration and Stewardship - Marin Islands NWR
Community-Based Restoration and Stewardship - Martin Luther King Jr. Regional Shoreline
Community-Based Restoration and Stewardship - Ravenswood Salt Ponds
Community-Based Restoration and Stewardship - San Francisquito Creek Baylands
Community-Based Restoration and Stewardship - Tolay Creek and Tubbs Island
Concord NWS Wetlands Restoration
Condor Stabilization Project
Confluence Meadow Restoration
Connector Marsh
Contra Costa Rock Slough Fish Screen
Contra Costa Water District Shortcut Pipeline Improvement Project Phases 1-3 Mitigation at Rheem Creek Property
Convair Lagoon Eelgrass Mitigation Project
Cookhouse Meadow Stream and Floodplain Restoration Project
Cooley Landing
Cooley Landing Project
Coon Creek
Coon Creek Culvert Replacement and Fish Passage Enhancement
Copeland Sewer Project (PW 3329)
Corbin Avenue/Oakdale Storm Drain and Residential Establishment
Cordilleras Health System Replacement Project Mitigation
Coronado Bay Bridge Eelgrass Mitigation Project
Corralitos Creek Barrier Removal Project
Corte Madera 4-Acre Tidal Marsh Restoration Project
Corte Madera Creek - College of Marin "Dog Park" Habitat Restoration
Corte Madera Creek - College of Marin Ecology Study Area Habitat Enhancement
Corte Madera Creek - College of Marin Lot 13 Habitat Restoration
Corte Madera Creek Flood Risk Reduction Project Phase 1—Lower COM Corte Madera Creek Habitat Restoration Project
Corte Madera Creek - Improve fish passage in and at upstream end of concrete channel
Corte Madera Creek - Southeastern Creekside Marsh Culvert Replacement and Habitat Enhancement
Corte Madera Creek Watershed - Assessment of Barriers
Corte Madera Creek Watershed Plan
Corte Madera Ecological Reserve Expansion and Restoration
Corte Madera Marsh Ecological Reserve Restoration - Greenbrae Gas Pipeline Emergency Replacement Project
Cosumnes Floodplain Acquisition and Restoration
Cosumnes Floodplain Mitigation Bank
Cosumnes-Mokelumne Floodplain Acquisition, Management, and Restoration Planning
Cosumnes River Acquisition, Restoration Planning, and Demonstration
Cosumnes River Preserve Habitat Restoration
Cosumnes River Preserve: Valensin Ranch Acquisition
Cosumnes River Wildlife Area - Ducks Unlimited Grant
Cosumnes River Wildlife Area (Ducks Unlimited Grant - Wetlands) (WCB ID:1991076)
Cosumnes River Wildlife Area, Expansion #1
Cosumnes River Wildlife Area, Expansion #2
Cosumnes River Wildlife Area, Expansion 2 (WCB ID:1995047)
Cosumnes River Wildlife Area - Oneto/Denier Property (WCB ID:2009112)
Cosumnes River Wildlife Area - Orr Road
Cottonwood Creek Park Riparian Restoration
Country Club Heights Erosion Control Project
County of San Diego Dept of Gen Services/Ramona Library Project
County of San Diego DPW/Summit Drive Drainage Improvement Project
Coyote Canyon Residential Development
Coyote Creek Flood Control Project
Coyote Creek Lagoon
Coyote Creek Watershed Plan
Coyote Hills Restoration and Public Access Project
Coyote Point Recreation Area Eastern Promenade Rejuvenation Project
Coyote Ridge Lower Road Culvert Replacement Project
CP San Onofre to CP Pulgas Double Track Project
Crescent Heights Residential Development
Cresta Road Emergency Culvert Replacement Project
Crissy Field Phase 1
Croak Road Drainage Project
Crown Cove Dock Eelgrass Mitigation Project
Crown Cove Dock Project
Crowne Hills
Crown Valley Village
Crystal Cove / El Moro
Crystal Springs Pipeline No.2 Replacement Project (CSPL2)
Cucamonga Canyon Post-Fire and Floods RE
Cullinan Ranch Restoration Project
Culvert replacement and upgrade- Christianitos Road, Marine Corps Base, Camp Pendleton
CWC Ranch Conservation Easement
Dairy Creek above Dog Park
Dairy Creek Upland Erosion Control project
Damon Slough Seasonal Wetland Mitigation
Dan Wilson Creek Bridge Project
Davy Brown Creek AOP Project
Deak Marsh
Dean York Driveway Bridge Replacement
Decker Island Habitat Development
Decker Island Tidal Habitat Restoration
Deepwater Slough Island
Deer Canyon Mitigation Site Temporary Stream Crossings
Deer Creek Irrigation District Dam Fish Passage Improvement Project
Deerlake Rance Residential Dev.
Deer Valley Wetland Restoration
DeForest-Dominguez Gap Wetlands: Planning and Design
DeForest Wetlands Restoration
Delevan NWR - Field 37
Delevan NWR -Tract ?
Delevan NWR - Tract 10
Delevan NWR - Tract 10-1
Delevan NWR - Tract 11
Delevan NWR - Tract 13
Delevan NWR - Tract 14
Delevan NWR - Tract 16
Delevan NWR - Tract 17
Delevan NWR - Tract 18
Delevan NWR - Tract 2
Delevan NWR - Tract 24
Delevan NWR - Tract 25
Delevan NWR - Tract 26.2
Delevan NWR - Tract 26.2 & 37.2
Delevan NWR - Tract 27.4
Delevan NWR - Tract 27 Brood Pond
Delevan NWR - Tract 35
Delevan NWR - Tract 37.2
Delevan NWR - Tract 39
Delevan NWR - Tract 41
Delevan NWR - Tract 42
Delevan NWR - Tract 44
Delevan NWR - Tract 5
Delevan NWR - Tract 5.1
Delevan NWR - Tract 6
Delevan NWR - Tract 7.2
Delevan NWR - Tract 9
Delilah Creek: Habitat and Water Quality Enhancement Project
Delta Island Adaptations - Bacon Island
Delta Island Adaptations - Bouldin Island
Delta Island Adaptations - Holland Tract
Delta Island Adaptations - Webb Tract
Demonstration_SG
Denman Reach Phase 3
Denny Ditch Fish Screen Design and Build
Denverton Legacy Project
De-Pave Park
Depth of Cover Repairs
Depth of Cover Repairs 2023
Desmond Ranch - Farming Option
Detention Basin Maintenance - Fair Oaks
Developing Restoration Strategies for Hydrologic Connectivity in Williams Creek
Devereux Slough/Ellwood Mesa Regional Plan
Devereux Slough: Ocean Meadows Acquisition
Devlin Road and Soscol Ferry Road Roundabout Project
DFG Minor Capital Outlay Wetland Projects, Gray Lodge Wildlife Area (WCB ID:2008006)
DFG Minor Capital Outlay Wetland Projects, Volta Wildlife Area (WCB ID:2008007)
DFG Wildlife Area Wetland Enhancement Projects, 2008/09 (Woodbridge ER) (WCB ID:2009044)
Diablo Foothills Regional Park - Arroyo del Cerro
Diablo Gateway
Dimond Park and Canyon Restoration
Discovery Park 0.5 Mile Advance Mitigation Site
Dixie Creek
Dixon Mine Road Bridge Replacement Project
Dock Replacement at 4517/4519 Cove Drive, Carlsbad
Dodge Development
Dog Valley Meadow Restoration
Doherty Drive Storm Drain Outfalls
Donner Creek Restoration
Donner Lake Outlet Channel Emergency Cleanout Project
Donner Pass Road Corridor Improvement - Phase 1 Project
Dooley Creek, Downing Meadow
Dos Rios Riparian Restoration (WCB ID:2013075)
DOT - HUM 254 - Myers Flat Permanent Restoration
DOT - MEN 1 - Jack Peters Bridge - 01-43484
Dotson Family Marsh Restoration & Public Access Project
Double Track Project
Downtown Coastal Resilience Project
Downtown Sewer, Water, and Storm Drain Improvements
Dowpass Road Extension Project
Doyle Drive Golden Gate Bridge South Access Project
Dragonfly Creek
Drainage Improvements and Wing Wall Repair on Cross Road at Mile Marker 0.05
Drakes Estero Restoration
Dry Creek Meadow Restoration
Dry Creek Meadow Restoration Sites 5 - 8
Dry Meadow Restoration Project
Dumbarton Bridge Seismic Retrofit Project
Dumbarton Bridge Structure Rehabilitation Project
Dumbarton Bridge West Approach Sea Level Rise Project
Dunphy Park Oyster Reefs
Dunphy Park Phase 2
DUST Marsh
Dutch Slough Tidal Marsh Restoration Project
EA 29763 SR 84 Expressway Widening and SR 84/1-680 Interchange Improvements Project Alameda County
Eagle Glen Phase 3
Earthen Dike and Ditch Repair 08-1G740
East Antioch Creek Marsh Restoration
East Branch Extension Phase II - Department of Water Resources
East Creek Restoration Project
East Delta Habitat Corridor, Tidal Marsh and Riparian Habitat Restoration
Eastern Sierra Pace & Scale Accelerator
East Garden Grove Wintersburg Channel Treatment
East Grasslands Wetlands Enhancement/Restoration (Castle Land and Cattle), Phase 2 (WCB ID:1999026)
East Grasslands Wetlands Enhancement/Restoration (Castle Land and Cattle) (WCB ID:1998008)
East San Rafael Wetlands
East Shore Park - Berkeley Meadows
East Shore Park - Schoolhouse Creek
East Shore Park - Strawberry Creek
East Ski Island Eelgrass Mitigation Project
East Third Avenue Landfill Closure
East-West Water Transmission Pipeline Project – Segment 4, Solano County
EBDA First Mile Horizontal Levee Project
EBMUD Moraga Road Pipeline Project
Eden Ecological Preserve Restoration Project
Eden Ecological Preserve Restoration Project - Dixon Landing Road Project
Eden Landing Ecological Reserve - Baumberg Tract Acquisition
Eden Landing Ecological Reserve - Baumberg Tract Restoration
Edgerley Island Marina
Edgerly Island Prioritized Alternative: Groundwater Well and Wastewater System Floodproofing
EdSan Solar Storage 1C
Edwards Creek Restoration
Edwards Solar Mitigation Site
Eelgrass Monitoring and Pilot Restoration Project, San Francisco State University
Eelgrass Protection and Creation Project - McLaughlin Eastshore State Park
Eelgrass Restoration and Baywide Inventory-SF Bay CalTrans
Eel River Arundo Eradication Planning Project
El Capitan Creek Fish Passage Restoration Implementation
El Corte de Madera Creek Watershed Protection Program
El Dorado Nature Center Renewal
El Dorado Wetlands Restoration Plan
Elizabethtown Creek- West Ranch
Elk Creek Restoration Feasibility Study
Elkhorn Creek Restoration Project
Elkhorn Slough Agricultural BMP Demonstration
Elk Slough Fish Passage and Flood Improvement Project
Elk Valley Road Fish Passage Design Project
Ellis Creek Marsh
Ellwood Marine Terminal Restoration
Elmhurst Creek Sediment Removal and maintenance Project
El Norte Parkway Drainage
Elsie Gridley Mitigation Bank/Benicia Bridge Replacement
Elsie Gridley Mitigation Bank/C-17 Assault Landing Zone
Elsie Gridley Mitigation Bank/Fairfield-Suisun Sewer District Waste Water Treatment Plant Improvement Project
Elsie Gridley Mitigation Bank/Meyer Warehouse Project - Phase II
Elsie Gridley Mitigation Bank/Mission Solano Rescue Mission 1
Elsie Gridley Mitigation Bank/Mission Solano Rescue Mission 2
Elsie Gridley Mitigation Bank/Travis AFB Runway 3R21L Repair
Elsie Gridley Multi-Species Conservation Bank
Elsie Roemer Enhancement Project
El Sobrante Library Project
El Toro Creek Restoration
Embarcadero Early Projects (Embarcadero Seawall Program)
Embarcadero Marina Eelgrass Mitigation Project
Emergency RGP-63 Hanson's Aggregate Bridge Replacement
Emery Road Realignment Project
Emeryville CAP - Emeryville Crescent Marsh living levee (or other protective measures)
Emeryville Crescent
Emily Renzel Marsh
Encina Power Post-dredge Eelgrass Survey
Engel Residence Concrete Footing Repair
Englehardt Residence
English Meadow Floodplain Restoration and Enhancement Project
English Meadow Restoration Project
Enhancing Native Species Habitat Along San Francisco's Waterfront
Enlisted Dining Facility 31 Area (P-1033) CERS
Environmental Volunteers EcoCenter
Ephemeral Tributary to Rattlesnake Creek Stabilization Project
Escondido Beach Kelp Reforestation Project
Escondido Creek and Harmony Grove Material Removal Project
Escondido Creek Watershed Restoration Action Strategy
Estero Americano Preserve Enhancement
Estudillo Canal Reconstruction
Estudillo Canal (Zone 2 Line A) Wall Repair Between Crosby Street and Manor Boulevard (F02C91)
Eticuera Creek Watershed Restoration
ETS 20259 - Replacement of Transmission Pole Z90289
ETS 20680 - Retention Barrier Installation at Pole Z204525, San Dieguito River
ETS 20820 - Replacement of Distribution Pole P219710 - Gopher Canyon
ETS 20879 - Los Penasquitos Utility Pole Replacement
ETS 20933 - Utility Pole Z418083 Replacement Project
ETS 21039 - Gas Line 3010 South Retrofit Activities
ETS 21039 - Gas Line 3010 South Retrofit - Siphon Tee Removal at Marian Bear Park
ETS 212353 - Soledad Canyon Erosion Control Measures
ETS 21304 - Erosion Repair to Protect Span 3008B, Fallbrook
ETS 21482 - Replacement of Distribution Pole P614454, Julian
ETS 22106 - Bury Exposed Gas Pipeline
Euer Valley Restoration - Phase 1
Evolving Shorelines Project at Bothin Marsh
Exchequer Meadow Restoration Project
Executive Redge Industrial
Faber Tract Marsh
Fairfield Corporate Commons Project
Fairfield - Markeley Lane Extension Project
Faith Valley Meadow Restoration Project
Fall Creek Fish Habitat Maintenance Project
Famosa Slough Culvert Extension and Retrofit Design
Faria Preserve Development Project
Feather River Wildlife Area, O'Connor Lakes Unit
Feather River Wildlife Area, Riparian Habitat Restoration, Abbott Lake Unit, Augmentation (WCB ID:2015057)
Feather River Wildlife Area, Riparian Habitat Restoration, Nelson Slough Unit, Phase I (WCB ID:2007166)
Fellows Dike Maintenance Road Culverts Replacement Project
Felta Creek Sediment Reduction Project
Fenton Properties Acquisition
Ferber Ranch Routine Road Maintenance Project
Fernandez Ranch Acquisition
Fernandez Ranch Restoration and Public Access Project (Version 1)
Fernandez Ranch - Rodeo Creek Restoration and Public Access Project
Fern-Headreach Island - Conservation Easement
Ferrari Pond
Ferris Creek
Figueras Tract
Filipponi Ecological Area
Filipponi Revegetation Project SL-6-1R
Finch Creek Crossing at Hallisey House, Hastings Reserve
First Street Highway 29 Interchange
Fish Creek Crossing Project
FISHERIES RESTORATION GRANT PROGRAMSANTA ROSA CREEK RESTORATION AND IMPROVED LAND MANAGEMENT DESIGN PROJECT
Fish Friendly Farming for the Delta
Fivemile Creek Streamflow Restoration
Flinn Springs Road Pathway
Fontana/Empire Business Center
Foothill Parkway Alignment, Corona, Rive
Foothill Transportation Corridor-North (SR 241) Southbound Widening
Forest Lawn Memorial Park
Former Hunters Point Power Plant Shoreline Remediation and Restoration
Former Sharp Park Rifle Range
Forni Meadow
Fort Ross Road PM 15.73
Fort Ross Road PM 15.80
Foster City Levee Improvement Project, O'Neill Slough Restoration
Foster City Levee Protection Planning and Improvements Project
Foster City Mitigation Sites
Foster Meadow Restoration Project
Fourmile Wetlands Restoration
Four Seasons Residential Development Project
Franks Tract
Freezeout Road PM 11.38
French Camp Conservation Bank
Frenchmans Creek Fish Passage Improvement Project
Friends of Pinole Creek Watershed Native Plant Restoration project
Front Street Bank Stabilization Project
Froom Creek Road Decommissioning
Froom Ranch/Home Depot Site Mitigation Project
Furlan Property - Advance Mitigation
Furlong Road Culvert Repair Project
Galbraith Golf Course Wetland Mitigation Project
Galiano Fen and Haypress West Meadow Restoration Planning Project
Gallagher Ranch Streambank Stabilization
Gallery Heights (AKA Woodcrest, T 28767))
Gallinas Creek
Garbani Project (Tract 28206) Residential
Garcia River Estuary Enhancement Project
Gasser, Vernice/FHK Investment - Gasser Estate Wetland Mitigation
Gateway East Winery Project
Gateway Tech Center Wetland Mitigation Site
Gaviota Creek Fish Passage Enhancement
Gaviota State Park Las Cruces Bank Stabilization
Gaviota State Park Riparian Restoration
Gazos Creek Large Gully Erosion Contol Project
Gazos Creek Uplands Erosion Contol Project
Geotechnical Activities For Lake Forest
Ghisletta Project Site
Giacomini Wetlands
Gianulius Property
Gilsizer Slough Wetlands Restoration (WCB ID:1993012)
Gilsizer Slough Wetlands (WCB ID:1992043)
Gleason Beach Highway 1 Roadway Realignment Project
Glenbrook Quarry Restoration and Dam Removal Project, Point Reyes National Seashore
Glen Cove Marsh
Glen Drive Culvert
Glen Echo Creek Restoration at Glen Echo Park
Glenshire Drive/Dorchester Drive Pedestrian and Bicycle Improvement Project
Glorietta Bay Marina Eelgrass Mitigation Project
Goat Canyon Enhancement Project
Goat Island Restoration and Public Access Project
Goldfish Pond
Goldfish Pond - Alameda Siphons
Goldfish Pond - Bay Division Reliability Upgrade Project 5
Goldfish Pond - Sunol Valley Water Treatment Plant
Goleta Slough Tidal Restoration
Goleta West Sanitary District Sewer Trunk Project
Gomez Creek Culvert Replacement Project
Goodrich Creek Home Ranch Restoration
Google Campus Expansion
Google Caribbean Campus-Sunnyvale West Channel Enhancement Project
Granada High School Crossing Removal Project
Granite Rock Ranch
Grant Avenue Bridge Rehabilitation Project
Grasshopper Creek Bridge Replacement
Grassland Environmental Education Center-Wetland Restoration (WCB ID:1996062)
Grasslands Conservation Area (WCB ID:2003182)
Grasslands Regional Park Habitat Restoration
Gray Lodge Wildlife Area, Expansion #6 (WCB ID:1996063)
Gray Lodge Wildlife Areas Wetland Enhancement (WCB ID:2012013)
Gray Lodge Wildlife Area, Water Distribution System, Phase II (WCB ID:2000085)
Gray Lodge Wildlife Area, Water Distribution System, Phases IV and V (WCB ID:2003074)
Gray Lodge Wildlife Area, Water Distribution System, Phases IV & V Augmentation (WCB ID:2004040)
Gray Lodge Wildlife Area, Water Distribution System, Phase VI (WCB ID:2006170)
Gray Lodge Wildlife Area Wells (WCB ID:2007077)
Grayson Creek Restoration Project
Gray's Ranch
Greene Off-Channel Habitat Enhancement Design Project
Green Gulch Landslide Repair Project
Greenhorn Creek- New England Ranch
Green Island Unit (Napa Plant Site Restoration)
Green Point/Toy Marsh
Green Valley Watershed Coho Migration Enhancement Project Design
Greenwood Ave Fish Passage
Greenwood Bay Condominium Homeowners Association Fishing Pier and Pedestrian Bridge Repair Project
Greenwood Commerce Center - Phase 1
Greenwood Gravel Beach Design Project
Greer Ranch
Gregory Canyon Landfill Project
Griffin Communities, Riverside County Flood Control and Water Conservation District
Griffith Street Outfall Rehabilitation Project
Grizzly Creek - Lafayette
Grizzly Island Road Bridge 23C-184 Construction at Hill Slough
Grizzly Island Station Project
Grizzly Island Wildlife Area
Grizzly Island Wildlife Area, Cordelia Slough
Grizzly Island Wildlife Area, Crescent Unit Water Conveyance
Grizzly Island Wildlife Area, Delta-Development
Grizzly Island Wildlife Area, Garibaldi Unit
Grizzly Island Wildlife Area, Goodyear Slough
Grizzly Island Wildlife Area Uplands and Wetlands Enhancement
Grizzly Island Wildlife Area Wetland Enhancement
Grizzly Island Wildlife Area Wetland Enhancement (WCB ID:2004106)
Grizzly Ranch Legacy Project
Grizzly Slough Floodplain Project
Grizzly Slough Mitigation Area, Phase 1
Grizzly Slough Mitigation Area, Phase 2
Grouse Meadow Restoration Project
Guadalcanal Village Restoration Project
Guadalupe River Bridge Replacement Project HMMP
Guadalupe River - Lower
Guadalupe River Restoration
Guava Street Bridge Project
Guthrie Interchange Seismic Retrofit
Habitat Restoration and Public Access, Sun River Unit, Stone Lakes National Wildlife Refuge (WCB ID:2003020)
Habitat Restoration and Solutions to Flooding of Butano Creek at Pescadero Road
Hacienda and Deep Gulch Remediation Project
Hackstaff Road Bridges Mitigation
Haera Wildlife Conservation Bank
Haire Ranch Acquisition, Skaggs Island
Haiwee Penstock Replacement Project
Hal Brown Park Small Habitat Restoration Project
Hale Creek Enhancement Pilot Project
Hale Mitigation Bank
Hall Ditch Check Structure
Hall Wines - Dry Creek Fish Barrier Removal and Enhancement Project
Hamilton Levee
Hamilton Wetlands - Airfield Acquisition
Hamilton Wetlands Restoration
Hanna Court Warehouse Project Site
Hanson Floodplain Restoration
Hanson Pond Acquisition, El Monte Valley
Harbor Excursions
Harbor Isles Condominium Owners Association Lake Fringe Wetland Restoration
Hare Creek Mainstem Instream Coho Habitat Enhancement Project
Harlowe Ranch LLC Klamath Off-project Water Lease
Harvey Marsh
Haskell Peak Meadows Restoration Project
Hasley Canyon
Hass Magoon Residence
Hat Creek Enhancement Project
Hawkins Cattle Company Klamath Off-project Water Lease
Hawkins Pivot Upgrade
Hawks Pointe-Fullerton Site
Hayfork Bike Lanes
Hayshed Gulch Large Wood Augmentation Project
Haystack Farm #1 - Nathanson & Castle Creek Enhancement Project (WDID# 2 CW442805)
Haystack Farm #2 - Nathanson Creek Enhancement Project (WDID# 2 CW442806)
Hayward Area Shoreline Adaptation Master Plan (SAMP) Planning Area
Hayward Marsh Brackish
Hayward Marsh Fresh
Hayward Shoreline Enhancement Project
Hayward Shoreline Enhancement Project - Oliver Salt Ponds
Hazard Park Wetlands Restoration Concept Plan
Hazel Mitigation Bank
Heart's Desire Beach Drainage System & Burial Site Repairs
Hedrick Ranch Nature Area Restoration Project
Hegenberger Road Creek Restoration Project
Henry Cowell Redwoods State Park San Lorenzo River Restoration
Hermosillo Residence
Heron Bay Levee Maintenance (COSL Project No. 2006.0210)
Heron's Head Park
Hessel Creek Riparian Mitigation Project
Hess Riparian Fencing
Hester Tidal Marsh Restoration
Hicks Mountain Ranch
Hiddenbrooke - Phase 3
Hilder Preserve
Hillcrest Park Bank Stabilization Project
Hill Slough Tidal Habitat Restoration
Hillview Estates, Subdivision 8533
Hoffman Marsh Restoration Project - McLaughlin Eastshore State Park
Hoffman Marsh Wetland Mitigation Project
Hog Island Oyster Company Shellfish Farm
Hoke Valley Meadow Restoration - Phase 1
Holdener Park Mitigation Project
Holland Tract Demonstration Project
Hollister Road Bridge Replacement Project (Chorro Creek)
Homestead Pond Bioregional Habitat Restoration Site
Homestead Pond - Cross Connections Controls
Homestead Pond - New Crystal Springs Bypass Tunnel
Homestead Pond - Pulgas Discharge Channel Modifications Project (Pulgas 2)
Honcut Creek WCA (WCB ID:1994033)
Honcut Creek Wildlife Conservation Area, Expansion 1 (WCB ID:1995002)
Honcut Creek Wildlife Conservation Area, Expansion 2 (WCB ID:1996009)
Honda Port of Entry - Burlington Northern Santa Fe Railway Company Corridor Improvements
Honegger
Honker Bay Conservation Bank/Wheeler Island
Hood Creek Lawson Trail Stream Crossings Project Riparian Restoration
Hope Valley Meadow Restoration Project
Hope Valley Restoration and Aquatic Habitat Enhancement
Hopper Creek Diversion Structure Bank Stabilization
Hornblower Project
Horseshoe Pond
Horse Valley Creek and Wetland Restoration Project
Hosselkus Creek
Hotchkiss 150-foot On-Site (1995 Repair)
Hotchkiss 850-foot On-Site (1995 Repair)
Hotelling Gulch Aquatic Restoration Project
Hoyt Park Vector Conrol
Hudeman Slough
Huichica Creek Enhancement
Huichica Creek Grassland Restoration
Huichica Creek Ponds
Huichica Creek Riparian and Salt Marsh Restoration Project
Huichica Creek Unit
Humboldt Bay National Wildlife Refuge - White Slough
Humboldt Bay Regional Invasive Spartina Eradication Project
Humbug Charles
Humbug Valley Yellow Creek
Hunter's Lot
Hunters Point Shipyard Project and Candlestick Point Redevelopment Project
Huntington Beach Wetlands Restoration
Huntington Beach Wetlands Restoration Plan
Huntington Harbor - Maintenance Dredge and Waterline Installation
Hydraulic Conductivity Testing - Sediment Sampling
I-15 La Mesa/Nisqualli Interchange
I-580 Stege Drain Bridge Rehabilitation Project
I-80 Improvements/HOV Land Project
I-880 Patterson Slough Southbound Bridge Deck Replacement Project
Ideal Marsh
IEAU RP4 Recycled Water Pipeline
Ignacio Creek HOA Culvert Outfall Repairs
Improvements at 353 West Baltimore Avenue in Larkspur
In-Channel Islands Demonstration
Incline - Third Creek Restoration
India Basin Shoreline Park
India Basin - West and East
India Basin Wetland Creation and Enhancement Project
Indian Valley
Industry East Planning Area
Ingomar Ranch Wetland Restoration (WCB ID:2006089)
Interim Water Tank Ravine Burn Dump Stabilization Project
Interstate 5 and Ortega Highway Interchange Improvement Project
Interstate 5/Genesee Interchange Project
Interstate 805 North Managed Lanes
Interstate 805 North Managed Lanes Project
Interstate 80 High-Occupancy Vehicle Lane Project
Intertidal Habitat Improvement Project - McLaughlin Eastshore State Park
Inverness Parcel Acquisition and Restoration
Inverness Ridge
Investigations of Restorations Techniques - Dutch Slough
Iron Gate Reservoir Intake Barrier
IRWD Duck Pond Reconfiguration
Isabel Ave/Interstate 580 Interchange Improvement Project
Ishizuka Preserve
Islais Creek Bridge Replacement
Islais Creek - Glen Canyon
Islais Creek Southeast Mobility and Adaptation Strategy
Islais Creek - Tidal Channel
Island Slough Wetland Development Project
Jacques Gulch Restoration Project
Jamacha Blvd. Phase II Drainage Improvements
Jamacha Park HOA-Culvert Cleanout
Jameson Canyon State Route 12 Widening Project
Jamison Creek
Jaques Conservation Easement
Jenny Farms Conservation Bank
Jepson Prairie Preserve Restoration
Jeronimo Creek Low Flow Storm Drain Repairs at Arbolitos Road
Jeronimo Creek Low Flow Storm Drain Repairs at Silleros Road
Jerry Meints Residence (71-750 Painted Canyon Road)
Jesmond Dene Property
Jet-Dock Installation at Naval Base Point Loma
Jewett Creek Riparian Habitat Restoration (WCB ID:2006021)
Jewett Road Culvert Repair
John F. Kennedy Park Wetland Enhancement Project
John Muir Drive Erosion Control Project
Johnson Canyon Restoration
Joice Island Wildlife Area Wetland Habitat Restoration
Joint Outfall "B" Unit 1D Trunk Sewer
Jonas Salk Elementary School
Kellogg Resiliency Project
Kennedy Park Master Plan
Kenny Creek Instream Habitat Enhancement Project
Kent Island Restoration Project
Kern National Wildlife Refuge Recirculation Project (WCB ID:2016020)
Kern NWR - Chal Cost Share Exotics Removal
Kern NWR - Challenge Cost Share
Kern NWR - Poso Ck Gates
Kern NWR - Poso Ck Goose Lake Canal
Kern NWR - Tamarisk Control
Kern NWR - Tract 2
Kern NWR - Tract 44
Kern NWR - Tract 44a
Kern NWR - Tract 45
Kern NWR - Water Supply Improvements
Kern Plateau Meadows Restoration Project Phase I
Kern Plateau Meadows Restoration Project Phase II
KGO Towers
Khalda Development, LLC. Guzzler 1
Khalda Development, LLC. Guzzler 10
Khalda Development, LLC. Guzzler 11
Khalda Development, LLC. Guzzler 12
Khalda Development, LLC. Guzzler 13
Khalda Development, LLC. Guzzler 14
Khalda Development, LLC. Guzzler 2
Khalda Development, LLC. Guzzler 3
Khalda Development, LLC. Guzzler 4
Khalda Development, LLC. Guzzler 5
Khalda Development, LLC. Guzzler 6
Khalda Development, LLC. Guzzler 7
Khalda Development, LLC. Guzzler 8
Khalda Development, LLC. Guzzler 9
Khalda Development, LLC. LOT 10
Khalda Development, LLC. LOT 11
Khalda Development, LLC. LOT 87
Khalda Development, LLC. LOT 90
Killroy Oyster Point Life Sciences Center
Kimball Island Mitigation Bank
Kinder Morgan Line Section 130 Carquinez Strait Cover Project
Kingdom Hall of Jehovah's Witnesses - Napa
Kingdom Hall of Jehovah's Witnesses - Temecula
King Ridge Road PM 24.91
King Ridge Road PM 25.62
Kings Creek Concrete Removal
Kingston Village Marina
Kirby Hills Natural Gas Storage Facility - Phase II
Kirker Creek Watershed Plan and Partners for the Watershed
Kiser Property Acquisition - Camp 3 Ranch
Knightsen Wetland Restoration Project
Knights Landing Outfall Gate Fish Barrier Project
Kordahl Spring Enhancement
Kramer Junction Expressway (08-34770)
Kreuse Creek Bridge Replacement and Creek Enhancement
Kruse Ranch Road PM 3.28
Kruse Ranch Road PM 4.37
La Barranca Unit and Blackberry Island Unit
Lacey Meadows Restoration
La Colonia Stabilization Project
La Costa Town Square Commerical, Office and Residential Development Project
Lafferty Ranch Open Space Park Pedestrian Bridge Replacement
Laguna Canyon Channel Rehabilitation Project
Laguna Creek Restoration
Laguna Creek (Zone 6 Line E) Erosion Repair Project
Laguna de Santa Rosa Historical Ecology Study
Laguna de Santa Rosa Ludwigia Control Project
Laguna de Santa Rosa - Meadowlark Field
Laguna de Santa Rosa Middle Reach Restoration Project
Laguna de Santa Rosa Restoration and Management Plan
Laguna-Mark West Creek Watershed Master Restoration Planning Project
Laguna Wetlands Preserve Riparian and Oak Savannah Restoration
Lagunita Diversion Dam Removal and Creek Restoration Project
Lagunitas Creek Bridge
Lagunitas Creek Floodplain and Riparian Restoration Project
Lagunitas Creek - Tocoloma Flood Plain Access and Restoration
Lagunitas Creek Watershed Enhancement Plan
Lagunitas Creek Watershed Enhancement Project - Phase 1
Lagunitas Creek Watershed - Land Acquisition to Protect Creeks and Coho in West Marin
Lagunitas Creek Watershed - San Geronimo Valley Sediment Reduction
Lagunitas Watershed - Coho Instream Habitat Restoration in the San Geronimo Valley
La Honda Creek Open Space Preserve Pond Repair
La Jolla Centre III
Lake Calavera Boardwalk Trails
Lake Forest Sports Park and Recreation Center
Lake Forest Water Quality Improvement Project
Lake Gregory Sediment Management and Bioretention Project
Lake Hodges Bicycle Bridge
Lake Mathews Outlet Facilities Project
Lake Merced
Lake Merritt and Lake Merritt Channel Improvements
Lake Rancho Viejo Flood Control Channel Maintenance
Lakeside Drive & Mariner's Island Extension Mitigation
LandSmart Plan BMPs
La Paz Park Mitigation Plan
La Playa Area Emergent Remedial Pipeline Protection
Large Wood Augmentation in High Priority Coho Salmon Habitat in Mendocino County
Lario Creek Project Area
La Riviere Marsh
Larkspur Isles Condominiums Shoreline Stabilization Project
Larsen Creek Fish Passage
Las Flores Creek Restoration
Las Gallinas Ponds
La Sierra Residential Development
Last Chance- Charles
Last Chance Ferris Fields
Las Trampas Creek Repair at Boulevard Way Bridge
Las Trampas Creek & tributaries - Lafayette
Las Virgenes Unified School District HIG
Lauterwasser Creek Sediment and Vegetation Removal
LCM Property LC
L-Ditch Remediation Project
Leavitt Lane Bridge 7C-62 Storm Damage Repair
Lee Vining Erosion Area 6
Lefty O'Doul Bridge Replacement
Leigh Creekside Park Demonstration Revegetation Project
Le Meridien Eelgrass Mitigation Project
Lemon Creek Restoration and Monitoring
Lenihan Dam Outlet Modification Project
Lenwood Spillway Flume
Leonard Ranch - North Parcel
Leonard Ranch Wetlands Restoration Project
Leon Basin Swale Relocation
Letter Property
Liberty Farms Wetland Restoration
Liberty Island Acquisition, Tracts 65 and 66
Liberty Island Conservation Bank
Liberty Island Tidal Habitat Restoration
Linda Isle/Harbor Island Eelgrass Mitigation Project
Line 235E P2 Validation Digs
Line D and Line D-1 Realignment (CIP #8157) Flood Control Realignment
Line E
Linne Road Bridge
Lion Creek (Leona Creek) Restoration Project
Lisbon Weir Modification Project
Little Hastings Island Conservation Bank
Little Indian Valley Restoration Project
Little Island Farms
Little Last Chance (Ramelli/Goss)
Little Mountain Sediment Basin Emergency Maintenance Project
Little Stony Creek
Little Truckee River Fish Habitat Improvement Project
Live Oak Wetland Restoration (WCB ID:2004107)
Livermore-Amador Valley Water Management Agency Export Pipeline Facilities Project
Living Arroyos Program Overview
Living Pilings: a novel approach to subtidal habitat restoration and prey enhancement for sea ducks
Living Shorelines: Near-Shore Linkages for San Francisco Bay
LJCC-South Pointe West LLC Development O
Llano Seco Rancho Wildlife Area (WCB ID:1991050)
Lodi Energy Center
Logan Springs Meadow Restoration
Logan Springs Meadow Restoration Project
Log Cabin Ranch Mindego Creek Access Road Repair Project
Log Meadow Restoration Project
Loma Alta Slough Wetlands Enhancement Project - Phase 2 Implementation
Lombard Crossing Industrial Park Project - Phase 1
Loney Meadow Restoration Project
Long Beach Restoration Project Design
Long Canyon Ranch Preserve
Long Meadow
Long Valley Creek
Los Alamitos Pump Station
Los Alamos Hills Sports Complex
Los Angeles River Taylor Yard: Acquisition & Implementation Plan
Los Banos Wildlife Area, Expansion 4 (WCB ID:1992024)
Los Banos Wildlife Area Lift Pumps (WCB ID:2010056)
Los Banos Wildlife Area, Mud Slough Unit, Expansion 3 (WCB ID:2001116)
Los Banos Wildlife Area, Wetland Restoration (WCB ID:1994039)
Los Cerritos Wetlands Complex - Bryant Acquisition Phase 1 & 2
Los Cerritos Wetlands Southern Area Planning and Permitting
Los Gatos Creek Channel/Riparian Area Repair
Los Gatos Creek Watershed Maintenance Program
Los Osos Creek Riparian Habitat Restoration
Los Osos creek wetland reserve
Los Penasquitos Canyon Preserve Sediment Management
Los Penasquitos Creek Sediment Management
Los Penasquitos Lagoon Restoration Design and Feasibility Study
Los Posas Creek Cleanup
Lost River Groundwater and Stream Flow Project
Lost River Point Source Restoration
Lost Slough Wildlife Area
Los Virgenes Unified School District Middle School Project
Loukos Property Stream Bank Repair Project Site
Lower Antelope Curve Realignment
Lower Colma Creek Section 103 CAP
Lower Cosumnes River Floodplain Restoration Project
Lower Deer Creek Flood and Ecosystem Improvement Project
Lower Elkhorn Basin Levee Setback Project
Lower Marsh and Sand Creek Watershed Planning Project
Lower Marsh Creek - Oakley
Lower Natividad
Lower Newport Bay Eelgrass Mitigation Project 2011-2012
Lower Penitencia Creek Improvements Project
Lower Putah Creek Realignment Project
Lower Putah Creek, Riparian Habitat Restoration
Lower Putah Creek Watershed Plan Priority Project
Lower Refugio Creek Restoration
Lower Russian River Biotechnical Bank Stabilization
Lower Sacramento River Riparian Revegetation Project
Lower Sevenmile Screen
Lower Spring Branch Creek Tidal Marsh and Floodplain Restoration
Lower Tolay Creek and Lower Tubbs Island Marsh Enhancement Project
Lower Walnut Creek Emergency Interim Protection
Lower Walnut Creek Restoration
Lower Wildcat Creek
Lower Williamson Streambank Protection
Lower Yolo Ranch Tidal Restoration Project
Lucas Valley Road Gasoline Spill Infrastructure Removal Project
Lushing Property (Tract 29017)
Lushing Property Tract 29017
Lynch Creek Bank Stabilization Project
MacArthur/Bison Commercial Development
Machado Lake Habitat Restoration Project
Madden Paulus Project
Madera del Presidio Project - Phase I and II
Magee Preserve
Main Bridge Expansion-San Jacinto
Mainstem Ten Mile River Habitat Enhancement - Phase 2
Maintenance Cleaning of Sediment from Culvert, Old Bear Valley Creek Channel, and Silver Hills Creek Drainage Ditches
Maintenance & Future Adaptive Management Activities, Peyton Slough Remediation Project
Malibu Creek Arundo Removal Project
Malibu Creek Steelhead Barrier Removal (Cross Creek Road)
Malibu Lagoon Restoration
Malibu Lagoon Restoration and Enhancement
Manabe
Mandeville 1,350 foot On-site
Manila Flood Reduction and Drainage Enhancement Project
Manley Lane Culvert LOP 235 Repair
Manzanita Sea Level Rise
Mapes Ranch Wet Meadow Restoration Project
Mare Island Navy Conservation Areas
Mare Island Navy Mitigation Marsh
Mare Island Northgate Interchange Project
Mare Island Refuge
Mare Island Tidal Marsh Enhancement
Marina Sea Level Rise (BMASP)
Marina Village Flood Berm Upgrades
Marin City Stormwater Plan
Marine Corps Recruit Depot Fence Line Installation
Marine Group Boatworks (Chula Vista) Dredge and Breakwater Modifications
Marine Group Boatworks Eelgrass Mitigation Project
Mariner Cove & Marina Village
Marine Stadium Eelgrass Donor Beds
Marine Stadium Eelgrass Survey
Marin Flood Control/CDFG - Perennial
Marin Flood Control - Seasonal
Marin Headlands and Fort Baker Transportation and Infrastructure Management Plan (MH-FB TIMP)
Marin Municipal Water District Mt. Tamalpais Watershed Road and Trail Management Plan
Marin Municipal Water District Remediation of Unauthorized Discharge and New Culvert Installation, Fox Hollow Trail
Marin Sonoma Narrows Widening Project - Phase A1
Marisma de Nacion
Marre Weir (Lower SLO Creek Fish Passage Design and Habitat Improvement Project)
Marsh Creek Fish Ladder
Marsh Creek Habitat Enhancement Project
Marsh Creek Reservoir Rehabilitation
Marsh Creek Reservoir Rehabilitation r/w Acquisition
Marsh Creek Restoration Master Plan
Marsh Creek VII near Brentwood
Marsh Creek widening at Griffith
Marsh Drive Bridge Over Walnut Creek Replacement Project
Marsh Restoration Lower Santa Ana River Channel
Marsten Pump Station and Outfall Phase 3 Project
Marta's Marsh
Martinez Regional Shoreline - Marsh Restoration Phase III
Martinez Regional Shoreline Salt Marsh Enhancement Project
Martin Luther King Jr Regional Shoreline Bay Trail Gap Improvements Project (Doolittle Drive Enhancements)
Martin Luther King Jr. Regional Shoreline Restoration and Flood Management Project
Martin Luther King Jr. Regional Shoreline - Water Quality Project
Martin Slough Enhancement Project
Martis Wildlife Area Restoration
Mathis-Stukel Juniper Removal Phase II
Matilija Dam Ecosystem Restoration Program
Matilija Dam Removal Feasibility Study
Mattley Meadow Restoration Project
Mayberry Farms Subsidence Reversal/Carbon Sequestration Project
Mayhew's Landing
May Ranch Phase 6
Mays Canyon Road Post Mile 12.78
McAravy Ranch Wetland Restoration (WCB ID:2003358)
McCloud Soda Springs Meadow Enhancement Activities
McCormack-Williamson Tract - North Delta Project
McDonald Road Culvert Replacement
McGarvey Gulch Salmonid Barrier Improvements Project
McGrath State Beach – Wetlands Restoration and Campground Relocation
McInnis Marsh Beneficial Dredge Sediment Reuse and Tidal Wetlands Restoration
McIver Dairy Meadow Restoration Project
McKenzie Meadow Restoration
McKenzie Meadow Restoration Project
McLean Community Center - Mitigation
McNabney Marsh Enhancement Project
McNabney Marsh Tidal Restoration Project
McNears Beach Fishing Pier Emergency Repair Project
McReynolds Valley Restoration Project
Meadowlark Lane road construction project
Meadowview Erosion Repair Long Canyon Creek
Medford 1 (Fields 23 & 24)
Medford 2 (Fields 25 & 36)
Medford 3 (Field 51A)
Memorial Trail Improvement Project
Mendiburu Road Improvement Project
Mendocino County DOT East Road MP3.18 Bridge wingwall repair
Mendocino-Lake Community College Secondary Access Roadway
Mendota Wildlife Area, Expansion 10 (WCB ID:1990045)
Mendota Wildlife Area Wetland Development (WCB ID:1991016)
Mendota Wildlife Area Wetland Development (WCB ID:1991058)
Menlo Country Club Bank Stabilization Project
Merced NWR - Deadman Creek
Merced NWR - Duck Slough
Merced NWR - Glory Hole Mort
Merced NWR - Mariposa Creek, Big Ditch
Merced NWR - Tract 17
Merced NWR - Tract 30 Alpha P
Merced NWR - Tract 334
Merced NWR - Tract 348
Merced NWR - Tract 35
Merced NWR - Tract 4
Merced NWR - Tract 4a
Merced NWR - Viewing Platform - Tour Route
Merced NWR - Wells Drilled on Merced and Arena Plains
Merced NWR - Wetland Enhancement and Restoration
Meridian Project
Mesa Creek
Mescal Wash Culvert Debris Removal (Palmdale Blvd @ Mescal Wash MM 20.80)
Mesivta of Greater Los Angeles
Meyers Stream Environment Zone/ Erosion Control Project
Military Ocean Terminal Concord (MOTCO) Marsh Restoration Project
Millbrae and Burlingame Shoreline Area Protection and Enhancement Project
Millbrae Nearshore Outfall Restoration Project
Mill Creek Barrier Removal and Riparian Restoration Project in Talmage
Mill Creek Headwaters Restoration
Mill Creek (Navarro River) Large Wood Augmentation Project
Miller Creek
Miller Knox Regional Shoreline - Lagoon and Marsh Restoration
Miller Lake Wetland Restoration (WCB ID:2004057)
Mills College Lion Creek Stream Channel Stabilization
Mill Valley Flood Management and Storm Drain Master Plan
Mill Valley Marsh
Mill Valley-Sausalito Multi-Use Path Bridges 1 and 2 Repair Project
Mindego Creek Fish Passage Project
Miner's Ace Hardware Bank Stabilization Project
Mirada Road Pedestrian Bridge Replacement
Miraflores Sustainable Community Greenbelt - Baxter Creek Daylighting
Mira Monte Acquisition and Restoration
Mission Bay Ferry Terminal Project
Mission Bay South Shores Boat Launching Basin Eelgrass Mitigation Project
Mission Creek
Mission Creek at Bosque del Rio Hondo Park
Mission Creek Fish Passage Enhancement Project
Mission Creek Museum Area Restoration Plan
Mission Creek - San Francisco
Mission Ranch 2 Residential Development
Mission San Jose Water Treatment Plant Access Road Erosion Mitigation Project
Mission Trails Park Ranger Residence Culvert Repair
Mitigation for Caltrans State Route 138 Widening Project - Region 6
Miwok and Heather Cutoff Trail Surface Hydrology Rehabilitation Project
Mizuno Preserve
MLK Jr. Regional Shoreline Wetlands Project
Mockingbird Canyon (TT 30011) Residential Development
Modoc Plateau - Implement High Priority Meadows
Moffett Field Wetlands
Mojave River Levee Improvement
Molera Road Treatment Wetland
Molly B. Demuth Inc. Agricultural Development Project
Monarch Bay Shoreline Development Project
Monarch Beach Management Plan
Mono Chain Up Areas
Montecito Ranch Tract 29644
Montego Bay Marina
Montego Bay Project
Monte Verde Development Project
Montezuma Creek - Juarez St. Culvert
Montezuma Wetlands Restoration Project
Montna Farms Wetland Restoration (WCB ID:2007033)
Moon Glow Marsh
Moonlight Road and Lower Goodrich Creek Restoration
Moorpark WWTP Bank Stabilization Project
Moraga Creek Flood and Erosion Control Project
Morgan Hill TT32813
Mori Point
Mori Pt. Acquisition
Moro Cojo Slough Restoration and Enhancement Project
Morrison Creek: Coho salmon passage and habitat enhancement
Morro Bay FY 2010 Eelgrass Mitigation Project
Morro Bay State Park
Morro Bay State Park Marina Eelgrass Survey
Moseley Tract
Moss Landing Power Plant
Moss Landing Wildlife Area Wetland Habitat Restoration
Moulton Parkway Widening Project
Mountain Charlie Gulch Instream Habitat Restoration
Mountain Lake
Mountain Lake East Arm
Mountain Lake Remediation
Mountain Meadow- Greenville Creek
Mountain Meadows Conservation Project
Mountain Meadows Creek Restoration Project
Mountain Meadows- Upper Goodrich Creek
Mountain View Avenue Extension and Widening Project: Mission Creek Channel Bridge
Mountain View Avenue Extension and Widening Project: Santa Ana River Bridge
Mountain View Tidal Marsh
Mount Diablo and Galindo Creeks - Clayton
Mount Diablo Creek Watershed Coordinated Steelhead Passage Project
Mount Diablo Creek Watershed Planning Project
Mount Diablo Gateway
Mount Diablo State Park: Mitchell Creek Riparian Restoration
Mt. Tamalpais Culvert Maintenance & Replacement Project
Mud Slough Wetlands Restoration (WCB ID:1993048)
Mud Slough Wetlands (WCB ID:1992046)
Mud Slough Wildlife Area, Expansion #1 (WCB ID:1995027)
Mud Slough Wildlife Area, Expansion 2 (Gadwall Unit #1) (WCB ID:1999033)
Mud Slough Wildlife Area (WCB ID:1994072)
Mugu Sludge Ponds Restoration
Mulholland Ridge Pond Reconstruction
Munch Creek AOP Project
Munger Storm Drain (J010P01) BPM Pipe Repair Project
Murietta Corporate Center
Muroya Subdivision
Murrieta Education Center--Murrieta, Riverside County, CA
Murrieta Oaks
Murrieta SCGA/Highpointe communities
Muzzi Marsh
Muzzy Ranch Conservation Bank Phase 1
Napa Air Center Wetland Preserve
Napa Airport Corporate Center Phase III Preserved Wetlands
Napa Commerce Center
Napa Meadows Development
Napa River Arundo Removal Lodi Lane to Zinfandel Lane
Napa River Bank Stabilization - Carpy-Connolly Ranch
Napa River Bank Stabilization Project
Napa River Ecological Reserve - Local Community Enhancing
Napa River Fish Passage Project
Napa River Flood Protection Project
Napa River, Gasser Wetland Relocation
Napa River Habitat Assessment
Napa River Oxbow Preserve
Napa River Restoration: Oakville to Oak Knoll Reach
Napa River Rutherford Reach Restoration
Napa River Rutherford Reach Restoration Project
Napa River Watershed Urban Streams Enhancement Project
Napa-Sonoma Marshes Acquisition
Napa-Sonoma Marshes - Buchli Station Pond
Napa-Sonoma Marshes - Camp 2, Phase 1
Napa-Sonoma Marshes - Camp 2, Phase 2
Napa-Sonoma Marshes - Pond 2A
Napa-Sonoma Marshes - Pond 8 fish screen and water conveyance
Napa-Sonoma Marshes - Ponds 1, 1A, and 2
Napa-Sonoma Marshes - Ponds 3, 4, and 5
Napa-Sonoma Marshes - Ponds 6, 6A, 7, 7A, and 8
Napa-Sonoma Marshes - Southern Crossing Unit
Napa-Sonoma Marshes Wildlife Area Overview
Napa Sonoma Marshes - Wingo East
Napa Urban Waterfront Restoration
Napa Valley Gateway Business Park and Sheehy Creek Realignment and Enhancement Project
Napa Valley Unified School District Site
National City Marine Terminal Dredging B
National City Wharf Expansion Eelgrass Mitigation Project
Native Oyster Monitoring Report, UC Davis, funded by State Coastal Conservancy/ Ocean Protection Council
Native Plant Revegetation
Native Trout Preservation in the Santa Ana Watershed in Southern California
Native vegetation planting in McNabney Marsh buffer zone
Natividad Creek Park
Navigable Slough Flood Management Study
Navy (NEMS 1) Eelgrass Mitigation Project
Navy (NEMS 2) Eelgrass Mitigation Project
Navy (NEMS 6) at NAB Coronado Eelgrass Mitigation Project
NAWCA 1991-1 Llano Seco Rancho
NAWCA 1991-2 Traction Ranch
NAWCA 1991-2 Upper Butte Sink
NAWCA 1992-1 Cosumnes River
NAWCA 1992-1 Howard Slough
NAWCA 1992-1 Llano Seco Unit
NAWCA 1992-3 Llano Seco Unit II
NAWCA 1993-1 California Central Valley
NAWCA 1993-1 Freitas Unit I
NAWCA 1993-2 Cosumnes River II
NAWCA 1993-2 Upper Butte Basin
NAWCA 1994-2 Grasslands II, Merced
NAWCA 1994-2 Stone Lakes NWR
NAWCA 1995-2 Grasslands III, West Gallo
NAWCA 1996-2 Cosumnes River, Valensin Ranch
NAWCA 1996-2 Grasslands Ecological Area Enhancement & Restoration
NAWCA 1997-1 Stone Lakes Nwr Agri-Versified
NAWCA 1997-2 North Central Valley Wetland Habitat
NAWCA 1997-3 Suisun Marsh
NAWCA 1998-0-SM Stenner Springs Property Acquisition
NAWCA 1999-0-SM Dry Creek Watershed Land Acquisition
NAWCA 1999-0-SM Rodman Ranch & Slough Acquisition
NAWCA 1999-2 Cosumnes River Howard Ranch Acquisition
NAWCA 1999-2 North Central Valley Wetland Habitat II
NAWCA 2000-0-SM Pintail Slough Wetlands Development Project
NAWCA 2000-1 Butte Basin & Colusa Trough Wetland Habitat
NAWCA 2000-2 Grasslands Ecological Area Enhancement & Restoration II
NAWCA 2000-2 Grasslands IV, East Bear Creek
NAWCA 2000-2 San Pablo Bay Tidal Wetlands
NAWCA 2001-1 Suisun Marsh: Lower Joice Island Acquisition & Enhancement
NAWCA 2001-2 North Central Valley Wetland Habitat III
NAWCA 2001-2 Tulare Lake Basin Wetland Habitat Project
NAWCA 2002-2 Poso Creek Flood Plain Wetland Habitat Project
NAWCA 2003-0-SM Lakeview Farms Wetlands Conservation Project
NAWCA 2003-1 Butte Basin & Colusa Trough Wetland Habitat II
NAWCA 2003-2 Yolo Basin Wetland Habitat Project I
NAWCA 2003-2 Yolo & Delta Basins Wetlands Restoration & Enhancement
NAWCA 2004-0-SM Ormond Beach Bird Habitat Restoration Project
NAWCA 2004-1 Grassland Ecological Area III
NAWCA 2004-1 North Sacramento Valley Wetland Habitat Project I
NAWCA 2004-1 San Joaquin River I
NAWCA 2004-2 Grasslands V, San Luis Nwr Complex
NAWCA 2004-2 North San Joaquin Valley Wetland Habitat Project
NAWCA 2005-0-SM Carpinteria Creek Arundo Removal Project
NAWCA 2005-0-SM San Joaquin Basin Wetland Restoration
NAWCA 2005-0-SM Three Rivers Wetland Hydrology Enhancement
NAWCA 2005-0-SM Willow Creek Wetlands Enhancement Project
NAWCA 2005-1 Suisun Marsh Managed Wetlands Enhancement Project
NAWCA 2005-2 Yolo Basin Wetland Habitat Project II
NAWCA 2006-0-SM San Joaquin Basin Wetland Restoration II
NAWCA 2006-1 Northern Tulare / San Joaquin Basins I
NAWCA 2006-1 North Sacramento Valley Wetland Habitat Project II
NAWCA 2006-2 North San Joaquin Valley Wetland Habitat Project II
NAWCA 2007-0-SM Elmwood Tract, Phase I
NAWCA 2007-2 Butte & Colusa Basins Wetlands Project
NAWCA 2007-2 Yolo Basin Wetland Habitat Project III
NAWCA 2008-1 North San Joaquin Valley Wetland Habitat Project III
NAWCA 2008-1 Yolo & Delta Basins Wetland Restoration & Enhancement II
NAWCA 2008-2 American & Sutter Basins Wetlands Project
NAWCA 2008-2 Grasslands VI Sno - Bird Unit
NAWCA 2008-2 North Sacramento Valley Wetland Habitat Project III
NAWCA 2009-0-SM Grasslands Wetland Enhancement Project I
NAWCA 2009-0-SM Grizzly Ranch Wetland Enhancement Project
NAWCA 2009-1 Northern Tulare / San Joaquin Basins II
NAWCA 2009-1 San Luis - Private Lands I
NAWCA 2009-2 Suisun Marsh Managed Wetlands Enhancement Project, Phase II
NAWCA 2009-2 Yolo Basin Wetland Habitat Project, Phase IV
NAWCA 2010-0-SM Grasslands Wetland Enhancement Project, Phase II
NAWCA 2010-0-SM Grissom - Wetland Habitat Improvement Project
NAWCA 2010-1 Butte & Colusa Basins Wetlands II Project
NAWCA 2010-1 North Sacramento Valley Wetland Habitat Project - Phase IV
NAWCA 2010-2 Mid - Valley Wetland Habitat Project, Phase I
NAWCA 2010-2 Northern Tulare / San Joaquin Basins III
NAWCA 2010-2 Tulare Basin Wetlands Restoration
NAWCA 2011-0-SM Goodyear Duck Club Enhancement Project
NAWCA 2011-0-SM Grasslands Wetland Enhancement
NAWCA 2011-0-SM Grasslands Wetland Restoration And Upland Enhancement Project
NAWCA 2011-1 Dos Rios Ranch
NAWCA 2011-1 Suisun Marsh Managed Wetland Enhancement Project, Phase III
NAWCA 2011-2 Southern San Joaquin Valley Wetland Habitat Project, Phase I
NAWCA 2012-1 Northern Tulare / San Joaquin Basins IV
NAWCA 2012-1 North Sacramento Valley Wetland Habitat Project, Phase V
NAWCA 2012-2 Butte & Colusa Basins Wetlands III Project
NAWCA 2012-2 California Delta & Yolo Basins Habitat Project, Phase I
NAWCA 2012-2 Mid - Valley Wetland Habitat Project, Phase II
NAWCA 2012-2 Tulare Basin Wetlands Restoration II
NAWCA 2013-1 Butte & Colusa Basins Wetlands IV Project
NAWCA 2013-1 San Joaquin Wetlands Conservation
NAWCA 2013-2 Southern San Joaquin Valley Wetland Habitat Project, Phase II
NAWCA 2013-3-SM Horizon Habitat Enhancement
NAWCA 2014-1 North Sacramento Valley Wetland Habitat Project Phase VI
NAWCA 2014-2 California Delta & Yolo Basin Habitat Project, Phase II
NAWCA 2014-2 Northern Tulare San Joaquin Basins V
NAWCA 2014-2 Suisun Wetlands Conservation I
NAWCA 2014-2 Tulare Basin Wetlands Restoration III
NAWCA 2014-3-SM Central City Gun Club Restoration
NAWCA 2014-3-SM Piper'S Patch Enhancement
NAWCA 2014-3-SM Suisun Marsh Enhancement
NAWCA 2015-1 Mid - Valley Wetland Habitat Project III
NAWCA 2015-1 Southern San Joaquin Valley Wetland Habitat III
NAWCA 2015-2 Suisun Marsh Wetland Enhancement Project
NAWCA 2015-3-SM De Lorenzo Restoration
NAWCA 2016-0-SM Conaway Ranch Restoration 55
NAWCA 2016-0-SM Conaway Ranch Restoration 87
NAWCA 2016-0-SM Tule Meadows
NAWCA 2016-1 San Joaquin Wetlands Conservation II
NAWCA 2016-1 Wetlands of the Sacramento Valley I
NAWCA 2016-2 Suisun Wetlands Conservation II
NAWCA 2017-2 Butte & Colusa Basins Wetlands V
NAWCA 2017-2 Wetlands Of The Grassland Ecological Area Phase I
NAWCA 2018-0-SM Cache Creek Wetlands & Associated Riparian & Upland Habitats
NAWCA 2018-0-SM Gable Land & Cattle Company - Water Distribution Improvements
NAWCA 2018-0-SM Lone Tree Land & Cattle, Inc - Conveyance Improvements
NAWCA 2018-1 Wetlands Of The Sacramento Valley Phase II
NAWCA 2018-2 San Joaquin Wetlands Conservation III
NAWCA 2019-1 Delta - Yolo Basin Wetland
NAWCA 2019-1 Southern Central Valley Wetlands Conservation I
NAWCA 2019-2 San Joaquin & Kern Rivers Watersheds I
NAWCA 2019-2 Southern San Joaquin Valley Wetland Habitat IV
NAWCA 2019-2 Suisun Wetlands Conservation III
NAWCA 2020-0-SM Fortune Farms Conservation
NAWCA 2020-0-SM Mesquite Sportsmen's Club Wetland Enhancement
NAWCA 2020-1 Wetlands Of The Sacramento Valley III
NAWCA 2020-2 Butte and Colusa Basins Wetlands VI
NAWCA 2020-2 Wetlands of The Grassland Ecological Area II
NAWCA 2021-1 San Joaquin Wetlands Conservation IV
Nearshore Outfall Restoration Project
Neck and Bulb Transition Study
Neil M. Cleveland and Roger W. Epperson Vineyard
Nemerever Vineyards Water Project
Neptune Drive Floodwall Project
Nevada Parcel
New Chicago Marsh
New Irvington Tunnel
Newland Marsh Acquisition
Newland Marsh Restoration Permitting and Design
New Life for Eroding Shorelines
Newman Land Company Wetland Restoration (WCB ID:2005077)
Newport Beach Harbor Patrol Eelgrass Mitigation Project
Nichols Street Pier and Dock Renovation
Niguel Shores Revetment Rehabilitation Project
NMWD Project 7150 San Mateo Tank 24" Transmission Main Swale Restoration
Nolan Ranch Acquisition
Noonan Mitigation Bank/JP-8 Terminal and Pipeline Project at Travis Air Force Base
Nordstrom/Shorebird Marsh
Noriel Lane Storm Drain Protection and Trail Embankment Repair Project (PW 2420)
North Basin Wetlands
North Bay Intake Pump Station Replacement Project No. 072
North Bothin Marsh Enhancement Project
North Connector Project Suisun Creek Bridge
North County Regional Sea Level Mitigation
North Creek
Northern Outer Bair Island
North Fork Elk River Salmonid Habitat Enhancement Project Designs
North Fork Navarro River Whole Tree Instream Coho Habitat Enhancement Project - Phase I
North Grasslands Wildlife Area, Gadwall Unit (WCB ID:2007135)
North Grasslands Wildlife Area (Salt Slough Unit and China Island Unit) (WCB ID:1990006)
North Grasslands Wildlife Area Wetland Restoration, China Island Unit (WCB ID:1995005)
North Grasslands Wildlife Area Wetland Restoration (WCB ID:2011185)
North Harbor Drive Bridge Eelgrass Mitigation Project
North Marsh
North Monterey County Amphibian Habitat Enhancement Project
North Ocean Beach Dune Restoration
North Point Joint Venture
North Ramsgate Development Project
North Richmond Shoreline Academy
North Richmond Shoreline Living Levee
North Richmond Shoreline - San Pablo Marsh Restoration
North San Pedro Road @ China Camp Engineering Feasibility Study
North Shoreview Flood Improvement Project
North Suisun Mitigation Bank/Keswick Village
North Suisun Mitigation Bank (Version 1)
North Sutter Bypass Ranch Wetland Enhancement Fund Shift (WCB ID:2010045)
North Sutter Bypass Ranch Wetland Enhancement (WCB ID:2007035)
Norton Ponds Acquisitions
Novartis Belmont Creek Sediment Removal Project, City of San Carlos
Novato Creek Antenna Field
Novato Creek Baylands Vision
Novato Creek Flood Control Project
Novato Creek Sediment Removal and Wetland Enhancement Project
Novato Deer Island Tidal Wetlands Restoration
Novato Sanitary District Reclamation Project
NRCS ACEP-WRE 5491041401G92
NRCS ACEP-WRE 5491041401GJ0
NRCS ACEP-WRE 5491041401GJD
NRCS ACEP-WRE 5491041401GJF
NRCS ACEP-WRE 5491041401GJJ
NRCS ACEP-WRE 5491041401GJP
NRCS ACEP-WRE 5491041401GJY
NRCS ACEP-WRE 5491041401GKX
NRCS ACEP-WRE 5491041401GL0
NRCS ACEP-WRE 5491041501GM8
NRCS ACEP-WRE 5491041501JLN
NRCS ACEP-WRE 5491041501JLP
NRCS ACEP-WRE 5491041501JQW
NRCS ACEP-WRE 5491041601JLY
NRCS ACEP-WRE 5491041601LC6
NRCS ACEP-WRE 5491041601LDY
NRCS ACEP-WRE 5491041601LFG
NRCS ACEP-WRE 5491041601LG8
NRCS ACEP-WRE 5491041601LHG
NRCS ACEP-WRE 5491041601LHQ
NRCS ACEP-WRE 5491041701LCP
NRCS ACEP-WRE 5491041701LHT
NRCS ACEP-WRE 5491041701MHK
NRCS ACEP-WRE 5491041701MHN
NRCS ACEP-WRE 5491041801Q8N
NRCS ACEP-WRE 5491041901MX1
NRCS ACEP-WRE 5491041901Q6D
NRCS ACEP-WRE 5491042001VPD
NRCS ACEP-WRE 5491042001VQ0
NRCS ACEP-WRE 5491042101VX0
NRCS EWPP-FPE 7591040000XN7
NRCS EWPP-FPE 7591040000XN8
NRCS EWPP-FPE 7591040000XN9
NRCS EWPP-FPE 7591040000XNC
NRCS EWPP-FPE 7591040000XNG
NRCS EWPP-FPE 7591040000XNH
NRCS EWPP-FPE 7591040100XND
NRCS EWPP-FPE 7591040100XNJ
NRCS EWPP-FPE 7591040100XNK
NRCS EWPP-FPE 7591040100XNL
NRCS EWPP-FPE 7591040100XNM
NRCS EWPP-FPE 7591040100XNP
NRCS EWPP-FPE 7591040200XNN
NRCS EWPP-FPE 7591040900SN4
NRCS EWPP-FPE 7591040900SNK
NRCS EWPP-FPE 7591040900T99
NRCS EWPP-FPE 7591040900TBJ
NRCS EWPP-FPE 7591040900TDF
NRCS EWPP-FPE 7591049800P3J
NRCS EWPP-FPE 7591049800XMZ
NRCS EWPP-FPE 7591049900XMJ
NRCS EWPP-FPE 7591049900XN0
NRCS EWPP-FPE 7591049900XN1
NRCS EWPP-FPE 7591049900XN2
NRCS EWPP-FPE 7591049900XN3
NRCS EWPP-FPE 7591049900XN4
NRCS EWPP-FPE 7591049900XN5
NRCS WRP 6691040000FJ0
NRCS WRP 6691040000FJ1
NRCS WRP 6691040000FJ2
NRCS WRP 6691040000FJ3
NRCS WRP 6691040000FJ4
NRCS WRP 6691040000FJ5
NRCS WRP 6691040000FJ6
NRCS WRP 6691040000FJ7
NRCS WRP 6691040000FJ8
NRCS WRP 6691040000FJ9
NRCS WRP 6691040000FJC
NRCS WRP 6691040000FJD
NRCS WRP 6691040000FJF
NRCS WRP 6691040000FJG
NRCS WRP 6691040000FJJ
NRCS WRP 6691040000FJS
NRCS WRP 6691040000FJT
NRCS WRP 6691040000FJV
NRCS WRP 6691040000FK0
NRCS WRP 6691040000FSF
NRCS WRP 6691040000FSL
NRCS WRP 6691040000FSM
NRCS WRP 6691040100FJX
NRCS WRP 6691040100FJY
NRCS WRP 6691040100FJZ
NRCS WRP 6691040100FK1
NRCS WRP 6691040100FK2
NRCS WRP 6691040100FK4
NRCS WRP 6691040100FK6
NRCS WRP 6691040100FK7
NRCS WRP 6691040100FK8
NRCS WRP 6691040100FK9
NRCS WRP 6691040100FKB
NRCS WRP 6691040100FKC
NRCS WRP 6691040100FKJ
NRCS WRP 6691040100FKK
NRCS WRP 6691040100FKL
NRCS WRP 6691040200FK5
NRCS WRP 6691040200FKM
NRCS WRP 6691040200FKN
NRCS WRP 6691040200FKP
NRCS WRP 6691040200FKQ
NRCS WRP 6691040200FKR
NRCS WRP 6691040200FKS
NRCS WRP 6691040200FKT
NRCS WRP 6691040200FKV
NRCS WRP 6691040200FKW
NRCS WRP 6691040200FKY
NRCS WRP 6691040200FKZ
NRCS WRP 6691040200FL2
NRCS WRP 6691040300FL6
NRCS WRP 6691040300FL7
NRCS WRP 6691040300FL8
NRCS WRP 6691040300FL9
NRCS WRP 6691040300FLB
NRCS WRP 6691040300FLC
NRCS WRP 6691040300FLD
NRCS WRP 6691040300FLF
NRCS WRP 6691040300FLH
NRCS WRP 6691040300FLK
NRCS WRP 6691040300FLL
NRCS WRP 6691040300FLM
NRCS WRP 6691040300FLN
NRCS WRP 6691040300FLQ
NRCS WRP 6691040300FLR
NRCS WRP 6691040300FLS
NRCS WRP 6691040300FLT
NRCS WRP 6691040400FM2
NRCS WRP 6691040400FM3
NRCS WRP 6691040400FM5
NRCS WRP 6691040400FM6
NRCS WRP 6691040400FM7
NRCS WRP 6691040400FM8
NRCS WRP 6691040400FMB
NRCS WRP 6691040400FMC
NRCS WRP 6691040400FMD
NRCS WRP 6691040400FMG
NRCS WRP 6691040400FMH
NRCS WRP 6691040400FMJ
NRCS WRP 6691040400FMK
NRCS WRP 6691040400FML
NRCS WRP 6691040400FMM
NRCS WRP 6691040400FMP
NRCS WRP 6691040400FMQ
NRCS WRP 6691040500FMN
NRCS WRP 6691040500FN1
NRCS WRP 6691040500FN2
NRCS WRP 6691040500FN4
NRCS WRP 6691040500FN5
NRCS WRP 6691040500FN6
NRCS WRP 6691040500FN7
NRCS WRP 6691040500FN8
NRCS WRP 6691040500FN9
NRCS WRP 6691040500FNB
NRCS WRP 6691040500FNG
NRCS WRP 6691040500FNH
NRCS WRP 6691040500FNJ
NRCS WRP 6691040500FNK
NRCS WRP 6691040500FNL
NRCS WRP 6691040500FNP
NRCS WRP 6691040600FPF
NRCS WRP 6691040600FPG
NRCS WRP 6691040600FPJ
NRCS WRP 6691040600FPP
NRCS WRP 6691040600FPQ
NRCS WRP 6691040600FPR
NRCS WRP 6691040600FPS
NRCS WRP 6691040600FPV
NRCS WRP 6691040700FM9
NRCS WRP 6691040700FPN
NRCS WRP 6691040700FQ0
NRCS WRP 6691040700FQ2
NRCS WRP 6691040700FQ3
NRCS WRP 6691040700FQ4
NRCS WRP 6691040700FQ8
NRCS WRP 6691040700FQ9
NRCS WRP 6691040700FQD
NRCS WRP 6691040700FQM
NRCS WRP 6691040700NHW
NRCS WRP 6691040800NHX
NRCS WRP 6691040800NHZ
NRCS WRP 6691040800NJ0
NRCS WRP 6691040800NJH
NRCS WRP 6691040800NJK
NRCS WRP 6691040900X77
NRCS WRP 6691040900X78
NRCS WRP 6691040900X79
NRCS WRP 6691040900X7B
NRCS WRP 6691040900X7C
NRCS WRP 6691040900X7D
NRCS WRP 6691040900X7F
NRCS WRP 6691041000NS8
NRCS WRP 6691041000XY2
NRCS WRP 6691041000Y08
NRCS WRP 6691041000Y1X
NRCS WRP 6691041000Y26
NRCS WRP 6691041000Y29
NRCS WRP 6691041000Y2B
NRCS WRP 6691041000Y3X
NRCS WRP 6691041000Y45
NRCS WRP 66910410011BM
NRCS WRP 66910410011W1
NRCS WRP 6691041100Y38
NRCS WRP 669104110129B
NRCS WRP 66910411013VD
NRCS WRP 66910411013VS
NRCS WRP 66910411013VW
NRCS WRP 669104110149R
NRCS WRP 669104110149Y
NRCS WRP 669104110149Z
NRCS WRP 66910411014B3
NRCS WRP 66910411014B8
NRCS WRP 66910411014BH
NRCS WRP 66910411014BK
NRCS WRP 66910411014JZ
NRCS WRP 66910411014K3
NRCS WRP 66910411014K6
NRCS WRP 66910411014KH
NRCS WRP 66910411014KM
NRCS WRP 66910411014KN
NRCS WRP 66910411014KP
NRCS WRP 66910411014KR
NRCS WRP 66910411014KS
NRCS WRP 66910411014L8
NRCS WRP 66910411014LM
NRCS WRP 66910411014LT
NRCS WRP 66910411014LX
NRCS WRP 66910411014M6
NRCS WRP 66910411014MB
NRCS WRP 66910411014MD
NRCS WRP 66910411014MF
NRCS WRP 66910411014MH
NRCS WRP 66910411014ML
NRCS WRP 66910411014MP
NRCS WRP 66910411014MR
NRCS WRP 6691041200Y3F
NRCS WRP 66910412019BZ
NRCS WRP 66910412019CJ
NRCS WRP 66910412019DC
NRCS WRP 66910412019DW
NRCS WRP 66910412019DZ
NRCS WRP 66910412019F1
NRCS WRP 66910412019FC
NRCS WRP 66910412019FD
NRCS WRP 66910412019FF
NRCS WRP 66910412019FV
NRCS WRP 66910412019GT
NRCS WRP 66910412019GW
NRCS WRP 66910412019J4
NRCS WRP 66910412019LD
NRCS WRP 66910412019XZ
NRCS WRP 66910412019Y0
NRCS WRP 66910412019Y1
NRCS WRP 66910412019Y2
NRCS WRP 66910412019YX
NRCS WRP 66910412019YY
NRCS WRP 6691041301D6H
NRCS WRP 6691041301DRH
NRCS WRP 669104920000B
NRCS WRP 669104920000C
NRCS WRP 669104920000D
NRCS WRP 669104920000F
NRCS WRP 669104920000H
NRCS WRP 669104920000J
NRCS WRP 669104920000K
NRCS WRP 669104920000M
NRCS WRP 6691049200FJK
NRCS WRP 669104930000G
NRCS WRP 669104930000L
NRCS WRP 669104930000N
NRCS WRP 6691049300FM1
NRCS WRP 6691049500FMT
NRCS WRP 6691049500FMV
NRCS WRP 6691049500FMW
NRCS WRP 6691049500FMY
NRCS WRP 6691049500FN0
NRCS WRP 6691049600FMZ
NRCS WRP 6691049600FNT
NRCS WRP 6691049600FNV
NRCS WRP 6691049600FNW
NRCS WRP 6691049600FNX
NRCS WRP 6691049600FNY
NRCS WRP 6691049600FNZ
NRCS WRP 6691049600FP0
NRCS WRP 6691049600FP1
NRCS WRP 6691049600FP2
NRCS WRP 6691049600FP3
NRCS WRP 6691049600FP4
NRCS WRP 6691049600FP5
NRCS WRP 6691049600FP6
NRCS WRP 6691049600FP7
NRCS WRP 6691049600FP8
NRCS WRP 6691049600FP9
NRCS WRP 6691049700FPD
NRCS WRP 6691049700FPW
NRCS WRP 6691049700FPX
NRCS WRP 6691049700FQQ
NRCS WRP 6691049700FQT
NRCS WRP 6691049700FQV
NRCS WRP 6691049700FQX
NRCS WRP 6691049700FR0
NRCS WRP 6691049700FR2
NRCS WRP 6691049700FR3
NRCS WRP 6691049701NFG
NRCS WRP 6691049800FJR
NRCS WRP 6691049800FR1
NRCS WRP 6691049800FRG
NRCS WRP 6691049800FRH
NRCS WRP 6691049800FRJ
NRCS WRP 6691049800FRK
NRCS WRP 6691049800FRL
NRCS WRP 6691049800FRM
NRCS WRP 6691049800FRN
NRCS WRP 6691049800FRP
NRCS WRP 6691049800FRQ
NRCS WRP 6691049800FRR
NRCS WRP 6691049800FRT
NRCS WRP 6691049800FRV
NRCS WRP 6691049800FRX
NRCS WRP 6691049800FRY
NRCS WRP 6691049800FS0
NRCS WRP 6691049800FS2
NRCS WRP 6691049800FS3
NRCS WRP 6691049800FS6
NRCS WRP 6691049800FS7
NRCS WRP 6691049900FS1
NRCS WRP 6691049900FS4
NRCS WRP 6691049900FS8
NRCS WRP 6691049900FS9
NRCS WRP 6691049900FSB
NRCS WRP 6691049900FSC
NRCS WRP 6691049900FSD
NRCS WRP 6691049900FSP
NRCS WRP 66910499014MQ
Nuss Preserve
Nutria Eradication Project - Phase One
NWP #6 for the P-637 Geotechnical Project
Oak Country II Agricultural Pond Spillway Repair
Oakland-Alameda Estuary Adaptation Project
Oakland Gateway Shoreline - Restoration and Public Access Project
Oakland International Airport Perimeter Dike - South Field
Oakland Middle Harbor Enhancement Project
Oakland Shoreline Leadership Academy Project
Oakley Creekside Park Restoration Project
Oakmont Village Meadowgreen #2 HOA Bank Stabilization Project
Oakport Project
Oak Woodland Restoration
Oceanpointe Project
Oceanside Harbor Maintenance Dredging Project 1
Oceanside Harbor Maintenance Dredging Project 2
Oceanus Geologic Hazard Abatement District Seawall Removal, Repair, and Extension
Off-shore Bird Habitat Project - McLaughlin Eastshore State Park
Old Haul Road: Dark Gulch Creek Crossing Stabilization Project
Old Ranch
Olema RV Resort and Campground Diversion Ditch Restoration Project
Oneonta Slough Tidal Linkage
Onyx Ranch Mitigation Lands
Orange Coast College Eelgrass Mitigation Project
Orangecrest Hills and Communities Southwest
Orange Memorial Park Water Capture Project
Orinda Oaks Development
Ormond Beach Edison Acquisition
Ormond Beach Wetlands Acquisition Part 1
Ormond Beach Wetlands: Acquisition, Part 2
Ormond Beach Wetlands Restoration Plan
Oro Grande Wash at Seneca Road Project
Oro Loma Marsh Climate Adaptation
Oro Loma Marsh Mitigation Project
Oro Loma Marsh Restoration - Hayward Regional Shoreline
Oroville Wildlife Area Flood Stage Reduction and Restoration Project
Ortega Street Bridge Replacement at Mission Creek
Osa Meadow
Otay Ranch University Villages 3, 8 and 10 Geotechnical Study
Otay Ranch Village Three Development
ouR Home - Resilient By Design
Outer Bair Island Pond VI
Outfall/Access Road, Santa Ana River, NO
Overlook Club
Owens and Hawkins Klamath Off-project Water Lease
Owens Lake High Flows Preparations
Owens Lake Storm Repairs
Owens Valley Concrete Resurfacing and Maintenance Project
Owens Valley Excavation and In-kind Replacement Project
Oyster Bay Regional Shoreline - Tidal Slough Restoration
Oyster Point Marina Dock Replacement Project
P-637 Geotech #2 Boring Project
PA-27 Residential Development, Turtle Ridge-Irvine, Orange County, CA
Pace Preserve (Wright-Elmwood)
Pacheco Marsh Restoration
Pacheco Pond
Pacifica Sea-Level Rise Adaptation Plan Adaptation Options
Pacific Century
Pacific Commons Development
Pacific Custom Materials Acquisition
Pacific Shores Center
Packer Ranch Fish Screen Project
Padua Hills Residential Development Project
Pala Lift Station Temporary Bypass Project
Palmaz Vineyards Creek Restoration
Palmdale Multimodal Transportation Center
Palm Tract Mitigation
Palmyrita Ave MP-002-001, MP-002-923, CO
Palo Alto Flood Basin
Palo Alto Harbor Improvements
Palo Alto Horizontal Levee Pilot Project
Palo Alto Horizontal Levee Pilot Project (PAHLP)
Palomar Station Planned Smart Growth Project
Pamo Road Dump Site Cleanup
Paradise Cut Conservation and Flood Management Plan
Parkway Commerce Center Development Project
Parr Boulevard Development Project
Parson's Slough
Passenger Vessel Landing Improvements for Hornblower Cruises at Grape Street and Navy Piers
Patrol Road Erosion Repair and Bank Stbailization
Patterson Creek Engineered Log Jam Project
Patterson Ranch Acquisition
Pavon Creeks and Scow Canyon Restoration Project
Peaceful Valley Ranch
Pellegri Ranch Preserve
Pellegri Ranch Preserve Fee Title
Peninsula Innovation Project
Pennington Creek Bank Stabilization
Pennington Creek Bank Stabilization Project
Peralta Creek
Peralta Creek Restoration Project
Peralta Creek Restoration Project at Cesar Chavez Park
Perazzo Meadows Restoration
Peri Park Stabilization and Flood Plain Restoration Project
Perry Gun Club Mitigation Project
Pescadero-Butano Creek Watersheds
Pescadero Creek Watershed Habitat Enhancement Projects
Pescadero Marsh
Pescadero Marsh & Butano Fish Passage
Pescadero Sea Level Rise Adaptation Project
Petaluma Boulevard Bridge Project (PW 1277)
Petaluma Marsh Acquisition, Enhancement, and Access - Hill Property
Petaluma Marsh Expansion and Restoration
Petaluma Point
Petaluma River at Dustman Road
Petaluma River Hunting Clubs
Petaluma River Marsh (Carl's Marsh)
Petaluma River - Watershed Enhancement
Petaluma River West Bank #1
Petaluma River West Bank #2
Petaluma River Wildlife Area, Burdell Unit
Peter Maloney Bridge Replacement
Petersen Ranch: Working Waterway Habitat Enhancement Project
Peterson Ranch Acquisition
Pete's Landing at Middle Bair Island
Peytonia Slough Area
Peytonia Slough South
Peyton Slough Wetland Complex Management
PG&E Ravenswood Cooley Landing Project
PG&E Shell Pond
PG&E Treatment Wetland, Bioreactor, and Habitat Ponds
Phelan Ranch Streambed Restoration Project
Pickel Meadow
Pier 1 Freshwater Lines Replacement
Pier 36 Removal
Pier 4 Replacement
Pier 70
Pier 7 Concrete Repairs
Pier 94 North
Pier 94 Upland
Pier 94 Wetland Restoration Project
Pier 98
Pier Renovation and Replacement U.S. Coast Guard Sector, San Diego
Piers 39 to 43.5 Sediment Remediation Project
Pillarcitos Creek Watershed Plan Implementation
Pillar Point Marsh and Pillar Point Bluff
Pine Gulch Creek Watershed Enhancement Project
Pinkston Slough
Pinole Creek Demonstration Project
Pinole Creek Demonstration Restoration Project
Pinole Creek Fish Passage Improvement Project
Pinole Creek Restoration
Pioneer Bank Stabilization Project
Pitkin Marsh - Lower
Pixley NWR - Tract 105
Pixley NWR - Tract 105a
Pixley NWR - Tract 105b
Pixley NWR - Tract 105c
Pixley NWR - Tract 105d
Pixley NWR - Tract 155
Pixley NWR - Tract 164
Pixley NWR - Tract 16a
Pixley NWR - Tract 16b
Pixley NWR - Tract 16c
Pixley NWR - Tract 16d
Pixley NWR - Tract 175
Pixley NWR - Tract 177
Pixley NWR - Tract 178
Pixley NWR - Tract 179
Pixley NWR - Tract 18
Pixley NWR - Tract 180
Pixley NWR - Tract 181
Pixley NWR - Tract 20
Pixley NWR - Tract 200
Pixley NWR - Tract 203
Pixley NWR - Tract 206
Pixley NWR - Tract 207
Pixley NWR - Tract 209
Pixley NWR - Tract 22
Pixley NWR - Tract 23
Pixley NWR - Tract 237
Pixley NWR - Tract 237a
Pixley NWR - Tract 237b
Pixley NWR - Tract 25
Pixley NWR - Tract 257
Pixley NWR - Tract 258
Pixley NWR - Tract 259
Pixley NWR - Tract 30
Pixley NWR - Tract 300
Pixley NWR - Tract 300a
Pixley NWR - Tract 300-I
Pixley NWR - Tract 302
Pixley NWR - Tract 30Ac
Pixley NWR - Tract 30Ad
Pixley NWR - Tract 30Ak
Pixley NWR - Tract 30c
Pixley NWR - Tract 30d
Pixley NWR - Tract 30h
Pixley NWR - Tract 30j
Pixley NWR - Tract 30p
Pixley NWR - Tract 30q
Pixley NWR - Tract 30r
Pixley NWR - Tract 30v
Pixley NWR - Tract 30z
Pixley NWR - Tract 381
Pixley NWR - Tract 473
Pixley NWR - Tract 484
Pixley NWR - Tract 6
Pixley NWR - Tract 86
Planning Area 17, Irvine Company
Planning Area 18
Plant Material Growing Ground Project - McLaughlin Eastshore State Park
Pleitito Creek Riparian Restoration (WCB ID:2016120)
Plummer Creek Wetlands Restoration Mitigation Project
Poff Ranch Open Space Preserve
Point Buckler Island
Point Edith Wetlands Project
Point Isabel Regional Shoreline - Wetland Restoration and Public Access
Point Martin Residential Subdivision Project
Point Molate Regional Shoreline - Restoration and Public Access Project
Point Pinole Native Oyster Reef
Point Pinole Regional Shoreline - Breuner Marsh Acquisition
Point Pinole Regional Shoreline - Lower Rheem Creek Restoration
Point Pinole Regional Shoreline - San Francisco Bay Interpretive Center
Point Pinole Regional Shoreline - Wetlands Enhancement
Polhemus Creek Restoration Project
Pond 1 Levee (Cullinan)
Pond 3
Pond A4
Pond A4 Resilient Habitat Restoration Project
Pond at Quartz road in Wallace, CA
Pond DR05
Ponds DR07 and DR08 Repair
Pope Ranch Conservation Bank
Poplar at Golf Course Trash Capture Project
Poplar Creek- 2003
Poplar Valley Meadow Restoration
Portal Road North
Portal Road North - Alameda Siphons
Portal Road North - Sunol Valley Water Treatment Plant
Portal Road South Habitat Improvement Site
Portal Road South Habitat Improvement Site - Alameda Siphons 4
Port of Los Angeles Pier 300 Eelgrass Mitigation Project
Port Sonoma Marina Perimeter
Post Fire Forest Management and Sediment Reduction for Coho Recovery
Post-Fire Restoration of Coast Range Headwaters for Multiple Benefits at Pepperwood Preserve
Potrero Power Station Project
Powell Meadow Restoration
Prefumo Creek Commons Project
Preserve at Redwood Shores Mitigation Bank
Prima Deshecha Canada Channel Rehabilitation Project
Prisoners Wetland and Lower Canada del Puerto Restoration
Prospect Island
Protect Belvedere (Belvedere Critical Infrastructure Project)
Pullman Ditch Improvement Project
Purisima Farms Acquisition
Putah Creek Mitigation Bank
Q2291208 - NCSBRC "Reed Mountain Sustainable Cultivation"
Quail Hollow Fish Passage
Queseria Creek Fish Passage Improvement
R19-03 Sulphur Creek Willow Installation
Radio Beach Expansion Project - McLaughlin Eastshore State Park
Ramona Burn Site Slope Stabilization
Rancho Dorado - Detention Basin Maintenance and Sediment Removal
Rancho Etiwanda Estates
Rancho Higuera
Rancho La Laguna TTM 28748
Rancho Rio Chico Wetland Enhancement (WCB ID:2008036)
Ranch Park Restoration
Randall Preserve Wetland Feasibility Study
Rapp-Guidici
Ravenswood Bay Trail Connection Project
Ravenswood Preserve Acquisition
Ravenswood Triangle
Rawson Canal Realignment Project
RCTC SR-79 Thompson to Domenigoni
Reach 2 (Urban Reach) Upstream of Highway 101, San Francisquito Creek Flood Protection, Ecosystem Restoration and Recreation Project
Reclamation District 2035/Woodland-Davis Clean Water Agency Joint Intake and Fish Screen
Reconstruction of Bollinger Road Bridge over Calabazas Creek
Recovery Action Plan for the San Francisco Garter Snake
Recovery of the California red-legged frog in the Lake Berryessa Tributaries Core Area,Napa County, CA through translocation, invasive predator management and population monitoring
Recycled Water Storage Pond No. 5 Project
Red Bull: New Year No Limits
Red Clover Dotta
Red Clover McReynolds
Red Clover Poco
REDD Property (APN# 162-120-51-00) Business
Red Hill Bay Restoration Project
Redondo Beach: Power Plant to Park Acquisition and Planning
Red Top Road Truck Climbing Lane Project
Redwood City Emergency Preparedness Project
Redwood City Ferry Terminal Project
Redwood Creek Restoration at Muir Beach (Big Lagoon)
Redwood Creek (SF Eel River) Large Wood Augmentation Project
Redwood Meadow Restoration Project
Redwood Park Entrance Roads Erosion Project along Redwood Creek
Redwood-San Andreas High School Marsh
Redwood Shores Protection and Enhancement Project
Reef Design Innovations for Living Shorelines
Refugio Creek Bridge Project
Regional Beach Sand Project (RBSP) II
Regionally Advancing Living Shorelines in San Francisco Bay
Regional Water Quality Control Plant (RWQCP) New Outfall Pipeline Project
Reintroduction and Research for Recovery of the Critically Endangered Pismo Clarkia
Renzel Marsh Habitat Restoration and Water Quality Enhancement Project
Repair Culverts Project
Repair Obregon Avenue Culverts
Repair of a Stock Pond and Related Spillway, Sky Ranch
Repair Voids at Berths Juliet and Kilo, Naval Base Coronado
Restoration and Monitoring of Riparian Habitat Corridors along the Lower Mokelumne River
Restoration of Eastern Delta Floodplain Habitats on Grizzly Slough in the Cosumnes River Watershed - Phase I
Restoration of Priority Freshwater Wetlands for Endangered Species at the Cosumnes River Preserve
Restoration of Priority Meadows in the Walker Watershed Project
Restoration of Zone 5 Line F-1 Flood Control Channel
Restoration Planning at River Garden Farms: Improving Aquatic Habitat Resiliency on Working Lands along the Sacramento River
Restore Hayward Marsh (Former USD Treatment Marsh)
Restoring Audubon Starr Ranch Riparian Woodlands with Community Participation
Restoring Ecosystem Integrity in the Northwest Delta: Phase II
Restoring Fish Migration Connectivity to the Salt River Coastal Watershed
Restoring Riparian Habitat for Native Aquatic Species in Southern Sierra Watersheds Q1996058
Restoring Wetland-Upland Transition Zone Habitat in the North Bay with STRAW
Re-Wild Mission Bay Conceptual Plan
Reynolds Meadow Complex
RGP-63 Emergency Transmission Line Pole Stabilization
Rheem Creek
Rhode Island Floodplain Management and Habitat Restoration
Rialto Channel Improvements South of Bas
Richardson Bay Bridge Marshes
Richmond Parkway
Rincon And Wohlford Penstock RD Placement
Rindel Creek Mitigation Project for Reis Avenue
Rindler Creek Wetland Site
Ringstrom Bay
Rio Hondo/Upper San Gabriel River Watershed Arundo Eradication Program
Riparian and Floodplain Habitat Restoration for Coho Recovery along Lagunitas and San Geronimo Creeks
Riparian Habitat Restoration Carmel River Lagoon
Riparian Habitat Restoration, Feather River Wildlife Area, O'Connor Lakes Unit, Fund Shift, Sutter County (WCB ID:2008090)
Riverford Road Trail Project
River Island Farms Wetland Restoration and Conservation Easement
River Island Farms Wetland Restoration (WCB ID:2004103)
River Park
Riverside Drive Storm Damage Project
Roaring River 20-3 Natural Gas Exploration Project
Roberts Ranch Wetland Enhancement (WCB ID:2005076)
Roberts Road Bridge Replacement
Robin Drive - The Preserve at Marin II
Rock Creek Restoration Project
RockRose Ranch Creek Bank Stabilization - Driveway Bridge Site
Rockville Trails Estates Acquisition
Rocky Ford Ranch
Rodeo Creek
Rodeo Renewed Project
Roe Island
Root Ranch Riparian Revegetation
Rose Canyon 8-Inch Transmission Line Creek Crossing Project
Rose Creek Bike Path and Pedestrian Bridge Project
Rose Valley Lakes System Alternatives Analysis and Feasibility Study
Ross Reservoir Landslide Repair Project
Route 101/Ralston Ave. Interchange
Rowes Creek Bridge (No.10C-0123) Replacement Project
Rowland Creek
Rudd Ranch Wetland Restoration (WCB ID:2003118)
Rumrill Boulevard Bridge Replacement (PW 442)
Rush Creek/Cemetery Marsh Enhancement
Rush Ranch
Rush Ranch Diked
Russian Gulch
Russian River - 2017 Redwood Valley Fire Restoration
Russian River Coho Streams Water Conservation and Storage
Russian River Estuary Management Program
Russian River Giant Reed (Arundo donax) Removal and Riparian Restoration Program
Russ Island
Ryan Creek Floodplain and Sediment Reduction Project
Ryer Island
Sacramento County FD
Sacramento NWR - Challenge Cost-Sac-Pool 12
Sacramento NWR - Challenge Cost Share Sac-T-27
Sacramento NWR - Cv Refuge Water Supply Improvements
Sacramento NWR - Pool 11
Sacramento NWR - Pool 7A
Sacramento NWR - Riv-Raven
Sacramento NWR -Sac-T-20
Sacramento NWR - Sac-T-2&3
Sacramento NWR - Sac-T-24
Sacramento NWR - Sac-T-39
Sacramento NWR - Sac- (Te)
Sacramento NWR - Sac- Tract 11.1-2
Sacramento NWR - Sac- Tract 3
Sacramento NWR - Tract 10
Sacramento NWR - Tract 12
Sacramento NWR - Tract 14
Sacramento NWR - Tract 15, Cell1
Sacramento NWR - Tract 16
Sacramento NWR - Tract 2
Sacramento NWR - Tract 3
Sacramento NWR - Tract 33
Sacramento NWR - Tract 38
Sacramento NWR - Tract 3a
Sacramento NWR - Tract 3-I
Sacramento NWR - Tract 41
Sacramento River National Wildlife Refuge, Codora Unit, Riparian Restoration (WCB ID:2008196)
Sacramento River National Wildlife Refuge - Jensen Unit Riparian Restoration (WCB ID:2014031)
Sacramento River National Wildlife Refuge, La Barranca Unit, Riparian Restoration, Phase II (WCB ID:2011040)
Sacramento River National Wildlife Refuge, La Barranca Unit Riparian Restoration (WCB ID:2009118)
Sacramento River NWR - Tract 10
Sacramento River NWR - Tract 10b
Sacramento River NWR - Tract 10n
Sacramento River NWR - Tract 11
Sacramento River NWR - Tract 11C
Sacramento River NWR - Tract 12
Sacramento River NWR - Tract 13
Sacramento River NWR - Tract 14
Sacramento River NWR - Tract 142
Sacramento River NWR - Tract 15
Sacramento River NWR - Tract 151
Sacramento River NWR - Tract 16
Sacramento River NWR - Tract 17
Sacramento River NWR - Tract 195
Sacramento River NWR - Tract 195a
Sacramento River NWR - Tract 1b
Sacramento River NWR - Tract 1c
Sacramento River NWR - Tract 20
Sacramento River NWR - Tract 200
Sacramento River NWR - Tract 201
Sacramento River NWR - Tract 201a
Sacramento River NWR - Tract 205
Sacramento River NWR - Tract 206
Sacramento River NWR - Tract 21
Sacramento River NWR - Tract 22
Sacramento River NWR - Tract 23
Sacramento River NWR - Tract 28
Sacramento River NWR - Tract 28a
Sacramento River NWR - Tract 29
Sacramento River NWR - Tract 33
Sacramento River NWR - Tract 35
Sacramento River NWR - Tract 38
Sacramento River NWR - Tract 38a
Sacramento River NWR - Tract 38b
Sacramento River NWR - Tract 39
Sacramento River NWR - Tract 40
Sacramento River NWR - Tract 41
Sacramento River NWR - Tract 70
Sacramento River NWR - Tract 71
Sacramento River NWR - Tract 75
Sacramento River NWR - Tract 75a
Sacramento River NWR - Tract 76
Sacramento River NWR - Tract 76a
Sacramento River NWR - Tract 76b
Sacramento River NWR - Tract 76c
Sacramento River NWR - Tract 76d
Sacramento River NWR - Tract 76f
Sacramento River NWR - Tract 76g
Sacramento River NWR - Tract 76h
Sacramento River NWR - Tract 76i
Sacramento River NWR - Tract 76j
Sacramento River NWR - Tract 76k
Sacramento River NWR - Tract 76m
Sacramento River NWR - Tract 76n
Sacramento River Wildlife Area Riparian Habitat Restoration (River Mile 169.5 R and River Mile 166.5 R)
Sacramento Valley Refuge (Change in Scope) (WCB ID:2002027)
Sacramento Valley Refuge (WCB ID:2001068)
Sacred Spaces: Sanctuary Park
Saddle Mountain Open Space Preserve
Salinas River Bridge Replacement on State Route 58
Salinas River Nonnative Invasive Plant Control and Restoration Program
Salmon Habitat Enhancement at Muir Woods National Monument
Salmon River Floodplain Restoration Planning and National Environmental Policy Act (NEPA) Analysis Project
Salsipuedes Creek Fish Passage Enhancement
Salvador Channel Bank Restoration & Erosion Control Project
San Andreas Reservoir Bioregional Habitat Restoration Site
San Anselmo Creek Bank Repair Project - 10 Court Lane
San Anselmo Creek - Treatment of Barriers to Salmonid Passage - Corte Madera Creek Watershed
San Antonio Creek
San Antonio Creek Erosion Control and Riparian Restoration
Sanborn Solar Mitigation Site
San Bruno Creek Emergency Tide Gate Repair Project
San Carlos Airport North Clear Zone
San Carlos Drive Storm Drain Repair Project (PW 1969)
Sanchez Creek Marsh
Sand Canyon Res. Ret. Wall
Sanders Ranch Creek Repair and Enhancement Project
Sandhill Crane Site Occupancy and Site Use Survey at the Mello-Jensen Property
San Diego Bay A-8 Anchorage and 350 Acre Surrounds Marine Debris Removal Project
San Diego Bay-Delta Beach Eelgrass Mitigation Project
San Diego Bay Native Oyster Living Shoreline
San Diego Bay-Shelter Island Eelgrass Mitigation Project
San Diego Bay Shipyard Sediment Eelgrass Mitigation Project
San Diego Canyon Wetlands Restoration Project
San Diego County Marine Protected Area (MPA) Wetland Restoration Project
San Diego County Women's Detention Facility
San Diego Harbor Excursion Eelgrass Mitigation Project
San Diego Harbor Excursion Redevelopment
San Diego Harbor Police and Transient Dock Eelgrass Mitigation Project
San Diego Master Storm Water Maintenance Program
San Diego River Land Conservation Program: Hanlon-Walker
San Diego Surf Fence Replacement and Maintenance
San Dieguito Lagoon Wetland Acquisition
San Dieguito Saltmarsh Eelgrass Mitigation Project
San Dieguito Watershed Invasive Species Control and Re-vegetation
San Dieguito Wetlands Restoration Project
San Dimas Emergency Culvert Cleaning
San Elijo Lagoon Restoration
San Francisco Bay Living Shorelines Project: Giant Marsh
San Francisco Bay Region Stream Habitat Improvement Program
San Francisco Bay Restoration Regulatory Integration Team (BRRIT)
San Francisco Estuary Invasive Spartina Eradication and Restoration Project
San Francisco Fiber Optic Cables Project
San Francisco Muni Islais Creek Motor Coach Maintenance/Operations Facility Project
San Francisco Waterfront Flood Study
San Francisquito Creek Bonde Weir Fish Passage Improvement Project
San Francisquito Creek Bridge Bank Stabilization Project
San Francisquito Creek Demonstration Projects
San Francisquito Creek Flood Damage Reduction and Ecosystem Restoration - Army Corps of Engineers General Investigation
San Francisquito Creek Flood Reduction, Ecosystem Restoration, and Recreation Project, San Francisco Bay to Highway 101
San Francisquito Creek Watershed Riparian Revegetation Program
San Francisquito Creek Watershed Steelhead Trout Passage Restoration
San Gabriel River Rubber Dam No 2 and No 3
San Gabriel Watershed Restoration Program
San Geronimo Creek Floodplain Complex and Wildlife Corridor Enhancement Project Designs
San Geronimo Creek - Roy's Pools Restoration Design
San Geronimo Creek & Tributaries Invasive Plant Removal
San Geronimo Creek Urban Watershed Restoration Design
San Geronimo Golf Course Bank Stabilization Project
San Geronimo Golf Course Coho-Friendly Habitat and Operations Plan
San Gregorio Creek Watershed Habitat Enhancement Projects
San Gregorio Farms Acquisition
San Jacinto Season Storage and Recovery Project
San Joaquin Marsh Enhancement - Phase I
San Joaquin Marsh Enhancement: Phase I & 2
San Joaquin Marsh Enhancement - Phase II Implementation
San Joaquin Marsh Hydrology & Climate Adaptation Feasibility and Planning
San Joaquin River Bypass Riparian Restoration (WCB ID:2013181)
San Joaquin River Floodplain Restoration and Floodway Enhancement at Banta-Carbona - Phase 1
San Joaquin River NWR - Tract 10
San Joaquin River NWR - Tract 15a
San Joaquin River NWR - Tract 15b
San Joaquin River NWR - Tract 15c
San Joaquin River NWR - Tract 15d
San Joaquin River NWR - Tract 15e
San Joaquin River NWR - Tract 19
San Joaquin River NWR - Tract 20
San Joaquin River NWR - Tract 21
San Joaquin River NWR - Tract 23
San Joaquin River NWR - Tract 29
San Joaquin River NWR - Tract 29a
San Joaquin River NWR - Tract 31
San Joaquin River Parkway, Jensen River Ranch Phase II Construction (WCB ID:2010041)
San Joaquin River Parkway, Jensen River Ranch Phase II Habitat Restoration (WCB ID:2010190)
San Joaquin River Parkway (Madera County) (WCB ID:2016151)
San Joaquin River Parkway, Riverbottom Park and Schneider Property Habitat Restoration, Augmentation (WCB ID:2017089)
San Joaquin River Parkway, Riverbottom Park and Schneider Property Habitat Restoration (WCB ID:2012151)
San Joaquin River Parkway, River West Fresno, Pump and Irrigation Improvements (WCB ID:2014039)
San Joaquin River Parkway, Spano River Ranch, Habitat Enhancement, Planning and Design (WCB ID:2012069)
San Joaquin River Parkway, Spano River Ranch Habitat Enhancement Project Augmentation (WCB ID:2017120)
San Joaquin River Parkway, Spano River Ranch, Habitat Enhancement (WCB ID:2015040)
San Joaquin River Parkway, Weed Management and Job Creation Project (WCB ID:2016054)
San Joaquin River Riparian Habitat, Expansion 14 (WCB ID:2003259)
San Joaquin Valley Wetland Restoration (Greenhouse Ranch and Bardin Ranch) (WCB ID:1995035)
San Joaquin Wetlands Associates Settlement (MID Eminent Domain) (WCB ID:2013102)
San Jose Creek Fish Passage Improvements - Dos Arroyos Ranch
San Jose Creek Restoration Project
San Jose Fish Passage Project
San Jose-Santa Clara Regional Wastewater Facility Legacy Biosolids Lagoons Cleanup Project
San Jose-Santa Clara Regional Wastewater Facility Outfall Channel and Instrumentation Improvements Project
San Jose-Santa Clara RWF Headworks Improvement Project
San Jose Water Reclamation Plant Outfall Repair
San Juan Hydrologic Unit - Non-native Species Eradication Plan
San Leandro Creek - Property acquistion
San Leandro Creek - Restoration
San Leandro Creek - South Hills Property Acquisition
San Leandro Creek Tree Removal Project
San Leandro (Lisjan) Creek Greenway
San Leandro Shoreline Marshlands Enhancement Project
San Leandro Shoreline Restoration Project
San Leandro Treatment Wetland for Pollution Reduction, Habitat Enhancement, and Shoreline Resiliency
San Lorenzo Creek
San Lorenzo Creek (Version 1)
San Lorenzo Riparian and Stormwater Management
San Luis NWR - Dickenson 4 Ditch
San Luis NWR - East Bear Creek
San Luis NWR - Gadwall & Winton Water Containment Structures
San Luis NWR - South Marsh Wetland Restoration
San Luis NWR - Souza Marsh
San Luis NWR - Sunrise (Arena Plains)
San Luis NWR - Tract 1
San Luis NWR - Tract 10
San Luis NWR - Tract 1a
San Luis NWR - Tract 1b
San Luis NWR - Tract 1c
San Luis NWR - Tract 310
San Luis NWR - Tract 310a
San Luis NWR - Tract 310b
San Luis NWR - Tract 310c
San Luis NWR - Upland Protection
San Luis NWR - Well Drilling and Development
San Luis NWR - West Bear Creek Restoration
San Luis NWR - Wetland Enhancement
San Luis Obispo Creek Watershed Restoration Plan
San Luis Rey River Arundo Removal and Habitat Restoration
San Luis River Park Trail Project
San Marcos Creek Specific Plan Project
San Marcos High School Drainage Improvements Project
San Marcos Sewer Interceptor Replacement Project - Reach 1
San Mateo Existing Creek Bank Retaining Wall Repair
San Mateo's Master Shoreline Parks Masterplan
San Onofre Nuclear Generating Station (SONGS) Eelgrass Mitigation Project
San Pablo Baylands Collaborative Protection and Restoration Project
San Pablo Bay National Wildlife Refuge
San Pablo Creek Bank Repair, Road 20 at 17th
San Pablo Creek Concrete Removal and Enhancement Project
San Pedro Creek Tidal Area
San Pedro Creek Watershed Plan
San Quentin Pump Station Reconstruction
San Ramon Creek - El Capitan Drive
San Ramon Creek - Front Street to Diablo
San Ramon Creek Stabilization Project
San Ramon Storm Drain And Landslide Stab
San Ramon Valley YMCA
San Simeon SP Cape Ivy & Germany Ivy Eradication
Santa Barbara Debris Basins Improvement Project
Santa Barbara Urban Streams and Wetlands Restoration
Santa Clara Living Shoreline
Santa Clara River Riparian Restoration and Community Engagement for the Santa Paula-to-Sespe Conservation Area
Santa Margarita River Fish Passage Project
Santa Monica Bay Watershed Acquisition
Santa Rita Creek-Elementary School
Santa Rita Creek-Ferrasci Ballpark
Santa Rosa Plain Adopt a Vernal Pool Program
Santa Rosa Plain Pennyroyal Mint Control
Santa Venetia Levee Upgrade Project (South Fork Gallinas Creek)
Santa Venetia Marsh
Santiago Basins Floating Pump Stations
Santiago Creek Riparian Restoration (WCB ID:2014195)
San Timoteo Sanitary Landfill Drainage I
San Tomas Aquino Creek Stabilization
San Vicente Creek Enhancement Project
San Vicente Creek Watershed Clematis Vitalba Control Project
San Ysidro Freight Rail Yard Improvement Project
San Ysidro School District/Vista Del Mar Elementary School
Saratoga Creek Hazard Tree Removal and Restoration Project
Sardine Meadow Restoration
SARI Pipeline Inspection
Sausal Creek - Bridgeview Erosion Control Project
Sausal Creek - Dimond Canyon
Sausal Creek Erosion Control Restoration Project
Sausal Creek Monterey Redwoods Understory Restoration
Sausal Creek Native Plant Propagation
Sausal Creek Watershed Community Restoration
Sausal Creek Watershed Management Plan
Sausalito Marine - Eelgrass Preserve
Saxon Creek Aquatic Organism Passage Project Phase 2
Saxon Creek Culvert Removal and Bridge Installation Project
SBD 15 Culvert Relining (1K710)
SBD 40 Reconstruct Channel (08-1H400)
Scannell Properties Warehouse Distribution Facility – North Richmond
SCE Rush Meadows Dam Modification Project
Schellville
SCLA Lead Track Line Project
Scott River Fisheries Monitoring Program
Scott River Mountain Meadow Restoration Program
Scott River Mountain Meadows Restoration Implementation
Scott River Tailings Design
Scott's Creek Watershed Council Riparian Restoration Project in Southern Coho Stream
Scottsdale Marsh Acquisition
Scottsdale Marsh Restoration
Seabreeze Marina
Seal Beach Sediment Augmentation Project
Seal Slough
Sea Mist (1): Ponds & Bioreactor
Sears Point Ranch
Sears Point Ranch Riparian Restoration and Public Recreation Project
Sears Point Road
Sears Point Tidal Wetland Restoration Project
Seaworld Lagoon Eelgrass Mitigation Project
Secure Space Self Storage – Benicia Road Project
Sediment Removal - Tijuana River Flood Control Project
Sediment Removal Work at Wildcat Creek from Rumrill Bridge to the Restoration Site
Seegers Preserve
Seiad Creek Off-Channel Pond Habitat Construction
Senador Mine Restoration Project
Senator Outing Duck Club
Sequoia National Forest Prioritized Meadows Restoration Project
Serrano Creek Stabilization
Serrano Creek Stabilization and Restoration
Sevenmile Creek Historic Channel Enhancement
SFMTA Islais Creek Facility: Floodproofing
SFO Shoreline Protection Program
SFO Shoreline Protection System Urgent Maintenance Project
Sheep Creek Bridge 0H470
Sheephouse Creek Sediment Source Reduction Implementation Project
Shell Marsh Restoration Project at Peyton Slough
Shepard Creek and Bairs Creek Repair Project
Sherman Island - Belly Wetland Restoration
Sherman Island Parcel 11
Sherman Island Setback Levee Habitat Enhancement Project
Sherman Island Wetland Restoration Project, Phase III (Sherman Whale's Spout)
Sherman Island Whale's Mouth Wetland Restoration Project
Sherman Scour Pond Habitat Enhancement Project
Shin Kee
Shollenberger Park Wetland Enhancement
Shoshone Springbrook Project
Sibley Alder Creek Restoration Project
Sid Commons Mitigation Project
Sierra National Forest Meadows Restoration and Watershed Resiliency Project
Silverado Storm Drain, Mojave
Simmons Slough - (Atherton & Olive)
Simmons Slough - (Cheng)
Simmons Slough Wildlife Corridor
Singleton Road Interim Bridge
Siskiyou 96 Culvert Replacement and Rehabilitation
Sitebank and Offsite Sediment Cleanup Project
Site Plan Review No. 23-004
Skaggs Island Acquisition-Transfer
Skaggs Island and Haire Ranch Restoration
Skyline Boulevard Bioregional Habitat Restoration Site
Skyline Quarry Bioregional Habitat Restoration Site
Skyline Road Extension Project
Skyraker Duck Club Wetland Enhancement
Sky Ranch Rehabilitation Project
Sky Ranch Stock Pond Rehabilitation
Skyway Landing Muted Tidal Marsh Mitigation
SL-4-1R
SL-7-1R
Slaughterhouse Point
SLO Creek Rock Weir
SLR Road Map - Bay Bridge Touchdown Living Levee
SLR Road Map - Lower Sausal Creek
Small Habitat Restoration Projects for 5651 Cervantes Avenue
SMART Track Raise at Hanna Ranch Rd
Smith Creek
Snag Island
Snake Creek Fencing and Off-Stream Watering
Snow Crest Restoration
Soda Creek - 2017 Atlas Fire Restoration
Soda Creek Restoration and Fisheries Improvement Planning Project
Soil Sampling at San Elijo Lagoon Ecological Reserve
Solar Star 3 & 4
Solstice Canyon Acquisition
Solstice Creek Steelhead Access Implementation
Solstice Creek Steelhead Access Implementation
Somerville Creek Instream Restoration Project
Songs Replacement Steam Generator Transport Project, Camp Pendleton, CA
Sonoma Baylands Restoration Project
Sonoma Country Inn
Sonoma County Riparian Corridor Mapping Pilot Study Project
Sonoma Creek and Tributaries: Stuart Creek Acquisition
Sonoma Creek and Tributaries: Stuart Creek Restoration
Sonoma Creek and Tributaries: TMDL Habitat Enhancement Plan Implementation
Sonoma Creekbank Stabilization Project
Sonoma Creek Baylands Restoration Project
Sonoma Creek Baylands Strategy
Sonoma Creek Lower Reach
Sonoma Creek: Protecting Stream Base Flows for Habitat
Sonoma Creek Riparian Revegetation
Sonoma Creek Tidal Marsh Enhancement to Improve Habitat and Water Quality
Sonoma Creek & Tributaries: Fish Passage Repairs (County Roads)
Sonoma Creek & Tributaries: Nathanson Creek Community Hands-on Restoration
Sonoma Creek & Tributaries: Nathanson Creek Preserve & Parkway
Sonoma Creek & Tributaries: State Park Road Rehabilitation
Sonoma Creek Water Quality and Aquatic Habitat Restoration Strategic Plan
Sonoma Valley Business Park
Sonoma Valley County Sanitation District Agua Caliente Stream Banks Stabilization Project
Sonoma Valley Habitat Stewards/Landowners Assistance Project
Soquel Creek Rock Slope Protection
Soquel Lagoon Enhancement Project
Sorrento Valley Double Track Project
South Basin Wetlands
South Bay Salt Ponds: A22, A23
South Bay Salt Ponds: Alviso - A8 Pond Cluster - Ponds A8, A8S, A5, A7
South Bay Salt Ponds: Alviso - Island Ponds A19, A20, A21 (Phase 2)
South Bay Salt Ponds: Alviso - Knapp Tract - Pond A6
South Bay Salt Ponds: Alviso - Mountain View Ponds - A1, A2W (Phase 2)
South Bay Salt Ponds: Alviso - Pond A18
South Bay Salt Ponds: Alviso - Ponds A16, A17
South Bay Salt Ponds: Alviso - Ponds A2E, A3N, A3W, AB1, AB2
South Bay Salt Ponds: Alviso - Ponds A9, A10, A11, A12, A13, A14, A15
South Bay Salt Ponds: Cargill Acquisition
South Bay Salt Ponds: Eden Landing Ecological Reserve Initial Stewardship Plan
South Bay Salt Ponds: Eden Landing - Pond E14
South Bay Salt Ponds: Eden Landing - Ponds E10, E11
South Bay Salt Ponds: Eden Landing - Ponds E12, E13
South Bay Salt Ponds: Eden Landing - Ponds E6A, E6B, 8
South Bay Salt Ponds: Eden Landing - Ponds E8A, E9, E8X
South Bay Salt Ponds: Eden Landing - Southern Eden Landing (Phase 2)
South Bay Salt Ponds: Ravenswood Complex - Ponds R3, R4, R5, S5, S5W
South Bay Salt Ponds: Ravenswood - Ponds R1, R2
South Bay Salt Ponds: Ravenswood SF2
South Bay Substation Relocation Project
Southbound Interstate 680 Sunol Grade Modified HOV Lane Widening Project
South Coyote Slough-Pond A18 Levee Setbacks
South End Project (Bolinas Lagoon Adaptation)
Southern Alameda Creek Watershed Plan
South Fork Eel River Seasonal Fish Weir: Targeting segregationand removal of an invasive predatory fish to benefit recovering salmonids
South Fork Scott River Habitat Restoration Project
South Fork Sprague-Deming Ranch Fish Passage
South Fork Sprague In-stream Habitat Improvement and Upland Thinning
South Fork Ten Mile River Habitat Enhancement - Phase 2 Implementation
South Fork Usal Creek Instream Enhancement Design Project
Southhampton Bay Marsh Enhancement & Interpretive Project
South Napa Wetland Opportunity Area
Southport Setback Levee Project
South San Diego Bay Coastal Wetland Restoration Project
South San Francisco Bay Shoreline Project
South San Francisco Bay Shoreline Project - Phase II
South San Francisco Bay Shoreline (Sunnyvale) Project, Permanente Creek to Guadalupe River
South Santa Fe Detention Basin
Spectrum 5
Spectrum 6
Spinnaker Marsh Restoration
SPL-1998-300600
SPL-2000-10621
Sprague RM 43.5
Spring Creek Ranch Meadow Restoration
Sproul Creek Salmonid Habitat Restoration Project
Squaw Valley/Alpine Meadow Base to Base Gondola Project
SR 150 Bank Stabilization
SR 37 Corridor
SR-37 Sea Level Rise Adaptation Study
Stabilization of the Bank of Thompson Creek, below San Felipe Road
Stabilization of the Bank of Thompson Creek Below San Felipe Road
Stage Route 116 Stage Gulch Road Curve Correction and Realignment Project in Sonoma County (Caltrans EA 283821)
Stampede Dam Modification
Standley Creek Restoration Implementation Plan
Stanly Ranch Acquisition
Stanly Ranch - North
Staten Island Acquisition and Enhancement
Staten Island Channel Bank Protection
State Route 101 HOV Lanes Project, Segment B
State Route 1 and State Route 84 Structures and Scour Mitigation Project
State Route 79 Widening Project: Thompson Road to Domenigoni Parkway
State Route 84 Niles Canyon Safety Widening Project
State Route 87 Detour II Sanitary Sewer Reconstruction Project - Phase II
Steelhead Habitat Enhancement Project (SHEP)
Stenner Creek @ Highland Drive (ST-2-4B)
Stevens Canyon Bridge Nos. 37C-576 and 37C-577
Stevens Creek Maintenance Project
Stevens Creek Shoreline Nature Study Area Restoration Project
Stevens Creek Steelhead Passage Improvement Project
Stevens Creek Tidal Marsh
St. Helena Comprehensive Flood Protection Project
Stinson Beach Nature-Based Adaptation Study
Stinson Dump/Causeway Removal
St.Martha Catholic Parish Murrieta
Stock Drive Realignment at Bryant Field
Stone Briar II
Stone Bridge Estates
Stonebridge Preserve
Stone Dairy
Stone Lakes National Wildlife Refuge
Stone Lakes National Wildlife Refuge Acquisition 1
Stone Lakes National Wildlife Refuge Acquisition 2
Stone Lakes National Wildlife Refuge Acquisition 3
Stone Lakes National Wildlife Refuge Acquisition 4
Stone Lakes National Wildlife Refuge Acquisition 5
Stone Lakes Restoration Project
Stonybrook Creek Crossing and Fish Passage Improvement Project; Stonybrook Creek Fish Passage Improvement Project
Stonybrook Creek Restoration and Fish Passage
Stony Point Road Bridge Project (PW 1304)
Storm Damage Repair on Route 1 PM 2.6
Stormdrain Outlets and Utility Upgrades for North Embarcadero Visionary Plan Phase 1
Storytelling Shoreline Futures: Youth Visioning and Action
Strategy to Advance Flood Protection, Ecosystems and Recreation (SAFER) along San Francisco Bay
Strawberry Creek mouth - Eastshore State Park
STRAW - Hamilton
STRAW MCSTOPPP Miller Creek Restoration
STRAW MCSTOPPP Vineyard Creek Restoration
Stream Bank Repairs and Habitat Improvements at 6825 Sir Francis Drake Boulevard
Streambank Stabilization Project at Felicita County Park
Stream Gauge Installation
Struve Slough Restoration
Stukel Juniper Removal II
Suburban Water Systems - Four Well Pads
Suisun City Wetland Mitigation
Suisun Creek Watershed Enhancement Program
Suisun Hunting Club 606
Suisun Marsh Essential Fish Screen Rehabilitation Project
Suisun Marsh Habitat Management, Preservation, and Restoration Plan (SMP)
Suisun Marsh Restoration and Enhancement (WCB ID:1994048)
Suisun Marsh Waterfowl Production and Enhancement, Phase 2 (WCB ID:2001079)
Suisun Marsh Waterfowl Production and Enhancement (WCB ID:1998044)
Suisun Marsh Watershed - Community Habitat Restoration
Sulphur Creek Embankment Porotection
Sulphur Creek Enhancement Project
Sulphur Creek Fish Passage Restoration
Sulphur Creek Restoration Project
Summerland Greenwell Preserve Enhancement
Summertree Drive
Summerwind Ranch at Oak Valley - Phase I
Sun Lakes North Village
Sunnyvale Baylands Park
Sun Ranch Drainage Easement Improvements Project
Sunrise Powerlink Project
Sunroad Marina Eelgrass Mitigation Project
Sunset Harbor Dredging Phase II Eelgrass Mitigation Project
Sunset State Beach
Support for Arundo donax Control
Surfers Beach
Surfers Beach Pilot Restoration Project
Sustainable Restoration Technologies for Bay-Delta Tidal Marsh and Riparian Habitat
Sutter NWR - Tract 11
Sutter NWR - Tract 11 Alpha GU
Sutter NWR - Tract 13
Sutter NWR - Tract 13a
Sutter NWR - Tract 18
Sutter NWR - Tract 19
Sutter NWR - Tract 20
Sutter NWR - Tract 20a
Sutter NWR - Tract 2 Alpha GU-1
Sutter NWR - Tract 2 Alpha R
Sutter NWR - Tract 2b
Sutter NWR - Tract 2c
Sutter NWR - Tract 2d
Sutter NWR - Tract 2e
Sutter NWR - Tract 2f
Sutter NWR - Tract 2 GU-2
Sutter NWR - Tract 2 GU-3
Sutter NWR - Tract 3
Sutter NWR - Tract 5
Sutter NWR - Tract 8
Sutter NWR - Tract 9
Sutter NWR - Tract 9 Alpha GU
Sutter NWR - Tracts 9,10,12
Sweetwater-Silvergate Eelgrass Mitigation Project
Swett Ranch Habitat Enhancement, Vallejo Swett Pond #5
Swiss Park Culvert Maintenance Project
Sycamore Canyon Mitigation
Sycamore Creek Development
Sycamore Grove Regional Park
Sycamore Ranch Knottwood Way Extension and Bridge Crossing
T32-2 Vegetation Enhancement Project
Tahoe Donner Nature Loop Improvement Project
Tahoe Keys Marina Maintenance Dredging
Tahoe Keys Shoreline Revetment Project
Tahoe Resource Conservation District - Lake Tahoe Aquatic Invasive Plant Control
Tahoe Valley Stormwater and Greenbelt Improvement Project
Tahoe Vista Boat Launch Aquatic Plant Control Project
Talbert Marsh Experimental Eelgrass and Cordgrass Survey
Talbert Marsh Restoration
Tamalpais Creek Bank Stabilization
Tasman Corridor Light Rail Transit Mitigation Project
Taylor and Tallac Restoration Project - Phase One Aquatic Invasive Plant Removal Project
Taylor Mountain Trail Construction
TCPUD/NTFPD Joint Wetland Project
Tehachapi Sanitary Landfill Drainage Improvements Project
Tehan Creek
Tembladero Wetland Demonstration Project
Temecula Pipeline Repair Project
Temecula Regional Medical Center
Temescal Creek - Intertidal
Temescal Creek - Urban
Tennessee Hollow: Eastern Tributary
Tennessee Hollow: El Polin
Tennessee Hollow: Fill Site 1
Tennessee Hollow: Inspiration Point
Tennessee Hollow: Land Fill 2
Tennessee Hollow: MacArthur Meadow
Tennessee Hollow: Quartermaster Reach/Crissy Field Phase 2
Tennessee Hollow: Remnant Reach
Tennessee Hollow: South East Dunes
Tennessee Hollow: Sumner Avenue Grassland
Tennessee Hollow: Thompson Reach
Tennessee Hollow: Western Tributary
Tennessee Hollow: Western Tributary Upland
Tennessee Hollow: YMCA Reach
Tennessee Valley/Manzanita Connector Pathway
Terminal Four Wharf, Warehouse, and Pile Removal Project
Terminal One Development & Waterfront Park
Termino Avenue Drain Eelgrass Mitigation Project
Termino Avenue Drain Project
Terminous Mitigation Area
Tesoro High School
Test Delta Restoration Project
The 1200 Weeks Street Primary School Project
The Acacia Creek at Union City Development Project
The Corte Madera Climate Adaptation Assessment
The Gates Mitigation
The Grand Bayway
The Lusk Company
The Lusk Company (Agent: LSA) - Ridgemoo
The Nature Conservancy A
The Nature Conservancy B
The Nature Conservancy BF
The Nature Conservancy C
The Nature Conservancy FW
Thermalito Afterbay Habitat Restoration (WCB ID:1995063)
The Spit and Oyster Point SLR Protection
The Village at Loch Lomond Marina
Thomas Mountain Ranch - Tentative Tract Map 36327
Thompson Creek Streambank Stabilization
Thompson Valley Restoration Project
Thorne Road Bridge Replacement
Thousand Island Lake Restoration Project
Three Creeks Parkway Restoration Project
Three Points Grid Resiliency Project (TD1557090) Los Angeles County
Tiburon Sugarloaf Landslide Repair Project
Tier 1: Restoration and Enhancement of Stream Resources along Arroyo Las Positas
Tijuana Estuary Tidal Restoration Program: I & 2
Tijuana Model Marsh Restoration
Tijuana River Valley Emergency Channel Maintenance
Tijuana River Valley Invasive Plant Control Plan
Tiscornia Marsh Acquisition (donation)
Tiscornia Marsh Restoration and Sea Level Rise Adaptation Project
TL 698 Wood to Steel Project
Tocaloma Floodplain Restoration Feasibility
Toland Road Landfill Biosolids Facility
Tolay Creek Ranch Acquisition
Tolay Creek Restoration
Tolay Lake Regional Park
Tomales Bay
Tomales Bay Living Shoreline Project
Tomales Dunes Wetlands
Tompkins Unit, Battle Creek Wildlife Area
Tonner Hills
Topanga Creek and Lagoon Restoration Program
Topanga Lagoon and Watershed Restoration
Topanga Lagoon Restoration Planning Phase 1
Tottino Ponds
Tower Road Project
Trabuco Creek Fish Passage Project at the Metrolink and I-5 Bridges
Trabuco Creek Road Improvement Project
TRACT 14551, CHINO HILLS GALSTIAN FAMILY
Trancas Creek Flood Control Channel Restoration Planning Project
Trancas Creek Lagoon Restoration Planning Project
Transforming Marin City's Urban Wetland
Transition Assistance Department Building
Travis Air Force Base - JP-8 Terminal and Pipeline Project
Treasure Island
Treasure Island Adaptive Shoreline Improvement Study
Treasure Island/Yerba Buena Island Development Project
Treated Outflow Discharge Relocation Demonstration
Triangle Marsh at Hayward Shoreline
Triangle Marsh at Larkspur
Triangle Marsh - Corte Madera Acquisition
Triangle Marsh - Hayward
Triangle Marsh - Newark
Triangle Marsh, Refuge Entry
Triangle Marsh Restoration Project
Trinidad Water Storage Tank and Pipeline Replacement Project
Trinity DOT Wildwood Road Hayfork Bridge Replacement Project
Triple C Ranch Bridge Project
Trout Creek Restoration - Reach 4 and 5
Truckee Meadows Restoration Project
Truckee River Fish Habitat Enhancement Project, Nevada County
TT 16209 East Lake Village Development
TT 5130 Residential Development, Moorpark
Tubbs Fire RWB Erosion Mitigation
Tubbs Island Levee Improvement Project
Tubbs Island Levee Setback
Tu Casa HOA Revetment Maintainence
Tulare Basin Wetland Enhancement (Change of Scope) (WCB ID:2010046)
Tulare Basin Wetland Enhancement, Phase III (WCB ID:2004073)
Tulare Basin Wetland Restoration (El Cinco and Los Alamos) (WCB ID:1995064)
Tulare Basin Wetland Restoration (Santura), Phase II (WCB ID:1996045)
Tule Basin Farms Wetlands Restoration (WCB ID:2006077)
Tule Red Tidal Habitat Restoration
Tule Red Tidal Habitat Restoration Project
Tuna Canyon SEA Acquisition
Tunitas Creek Beach Improvement Project
Tuolomne Meadow Gravel-Pit Restoration
Tuolumne River Bobcat Flat Salmonid Habitat Restoration - Duck Slough
Tuolumne River Watershed EXAMPLE 2
Tuolumne River Watershed EXAMPLE Project
Turri Road Bridge Replacement Project (Warden Creek)
Turri Road, Los Osos Creek Remedation Project
Tuscano Heights Residential Development
Twin Cities Police Authority Storm Drain Replacement and Bank Stabilization
Twin Cities Unit
Twitchell 1997 On-Site Mitigaton (7-Mile Slough)
Twitchell 2.02 Acre Site
Twitchell 4.04 Acre Site
Twitchell 8.08 Acre Site
Twitchell Existing Subsidence Reversal through Rice Cultivation
Twitchell Island - East End Wetland Restoration
Twitchell Island - San Joaquin River Setback Levee
Twitchell Island Setback Levee
Two Dog Culvert Replacement Project
Tyler Bank Stabilization
Tyler Island Levee Protection and Habitat Restoration Pilot Project
UCI East Campus Student Apartments
UCSB Campus Lagoon Enhancement Planning
UCSB North Campus Open Space Restoration
UCSD Clinical and Translational Research Institute
UCSD East Campus Bed Tower
UCSD East Campus Parking Structure
UKL Watershed Riparian Fencing
UKSIP Lower Sevenmile Creek Fish Passage
UKSIP North Ditch Screen and Passage
UKSIP Sevenmile Treatment Wetlands
UKSIP Sprague River Floodpain Rehabilitation
UKSIP Threemile Creek Habitat Enhancement
UKSIP Traynham Ranch Riparian Fencing
Ulatis Creek Arundo Control and Restoration Project
Union Pacific Railroad
Union Pacific Railroad Milepost 45.13 and 45.98 Martinez Subdivision, Wells and Boynton Sloughs, Bridge Replacement Project
Union Sanitary District Force Main Access Improvement Project
Union Sanitary District's Irvington Pump Station Holding Pond
Unnamed Creek Crossing Near Baird Road - 2017 Tubbs Fire Restoration
Update Scott River Strategic Action Plan, Engage the Public, and Plan and Undertake Restoration Actions
Upgrade and Expansion of the 12kV Electrical Distribution Systems (P-1094)
Upper Adobe Creek Fish Passage Project
Upper Butte Basin Wildlife Area, Expansion 3 (WCB ID:1991057)
Upper Butte Basin Wildlife Area, Expansion 5 (WCB ID:1993057)
Upper Butte Basin Wildlife Area, Expansion 6 (WCB ID:2009061)
Upper Butte Sink Wildlife Area Expansion #2 (WCB ID:1990009)
Upper Butte Sink Wildlife Area (WCB ID:1988093)
Upper Butte Sink WLA Expansion #1 (WCB ID:1988124)
Upper Butte Sink WLA Wetland Development (WCB ID:1991010)
Upper Castro Valley Creek bank stabilization, Madison Ave.
Upper Devereux Slough Restoration Implementation
Upper Hansen's Slough
Upper Hollow Tree Wood Loading Project
Upper Humbug Valley- Yellow Creek
Upper Klamath Basin Comprehensive Agreement - Deming Creek Ranches, South Fork Sprague
Upper Klamath Lake Watershed Riparian Fencing
Upper Last Chance
Upper Los Angeles River Watershed Arundo Eradication Program
Upper Mark West Creek and Maacama Creek Watersheds Management Plan
Upper Napa River Restoration Project
Upper Newport Bay and Alamitos Bay Living Shoreline Project
Upper Newport Bay Ecological Restoration Implementation
Upper Noyo River Fish Passage Improvement and Sediment Reduction Project
Upper Sevenmile Creek Critical Habitat Instream Transfer
Upper SLO Creek Dam Removal
Upper Sonoma Creek Habitat Restoration Plan & Demonstration Project Design
Upper Sonoma Creek Restoration Demonstration Project at Morton’s Warm Springs
Upper Sproul Creek Habitat Enhancement Project
Upper Sulpher Creek Restoration
Upper Truckee Marsh Sewer Facilities Protection Project
Upper Truckee River and Golf Course Re-Configuration Project
Upper Truckee River and Marsh Restoration Project
Upper Truckee River - Middle Reaches 1 and 2 SEZ and Wildlife Enhancement Project
Upper Truckee River Reach 5 Restoration Project
Upper Truckee River Tahoe Pines Restoration and Public Access Project
Upper York Creek Dam Sediment Removal Project
Upper York Creek Ecosystem Restoration and Aquatic Habitat Enhancement Project
Upper Zuniga Road Acquisition
US 101 at Marin City
U.S. Coast Guard Pier Renovation Eelgrass Mitigation Project
USGS Subsidence Research Project on Twitchell Island
U.S Highway 395 Widening Project Segment 5-8
U.S. Maritime Administration Marsh
Valencia Creek Culvert Project
Valencia Water Reclamation Plant Embankment
Valentine Solar LLC
Vallejo Mitigation Sites
Vallejo Self Storage
Valley Center Landfill Seep Cleanup
Valley Transportation Authority's Freight Railroad Relocation / Lower Berryessa Creek Project
Vandenberg AFB, San Antonio Creek Restoration Project @ Hwy. 1 to Lee Road
Van Norden Meadow Restoration Project
Vasona Creek Trail at West Valley College
Vasquez Canyon Road--BR3389--Sediment Removal Project--Newhall, Los Angeles County, CA
VCWPD Lower Brown Barranca Maintenance
VCWPD Santa Clara River Bendway Weirs
Vector Control Grading and Drainage Rehabilitation
Ventura Cove Eelgrass Mitigation Project
Ventura Harbor Eelgrass Survey
Ventura River Arundo Removal Project
Verde Village Unit 7, Lots 3241 & 3242
Vermont Ave South of Pacific Hwy Proj
Via Esprillo Emergency Storm Drain Replacement Project
Viansa Winery - Phase 1
Viansa Winery - Phase 2
Victoria Grove, Phase III & IV
Victorville Transmission Lines Erosion Control Project
Viewpoint School Modernization Project--2010 Hydrology Improvements, City of Calabasas, Los Angeles County, CA
Vikingsholm Wildfire Prevention Project
Village Creek
Vineyard Avenue Project
Vineyard Creek Channel Enhancement Project
Volta Wildlife Area, Expansion 1 (WCB ID:2003004)
Volta Wildlife Area, Expansion 2 (WCB ID:2003311)
Volta Wildlife Area Wetland Enhancement (WCB ID:2006053)
Waldo Point Harbor
Walker Lake Outlet Slide Gate Replacement Project
Walker Valley Ponds
Walnut and Grayson Creeks Desilting Project
Walnut Creek and Lafayette Arundo 2020 Creek Restoration
Walnut Creek Watershed Arundo donax Eradication Project - Phase 1
Walnut Estates
Walter's Creek Riparian Restoration Project - Phase I
Walter's Creek Riparian Restoration Project - Phase II
Wanda Lake Reroute
Ward Creek
Warden Creek
Ward Shorezone Repair Project
Warm Springs Pasture
Washington Creek Sediment Removal Project
Waterfront Marina Trust Land Use Plan
Waterman Water Treatment Plant Expansion Project
Watson Ranch AC-1 Project
Watsonville Slough @ Pajaro Mouth
WBSD Flow Equalization and Resource Recovery Facility (FERRF) Levee Improvements Project
Webb Ranch Mitigation Site
Weber Property Subdivision Project
West Alamo Creek - San Ramon
West Covina Sportplex Revegetation Study
West End Duck Club
Western Goleta Slough Wetland Restoration
Western Goleta Slough Wetland Restoration Project
Western Meadows Subdivision
Western Municipal Water District Section 28 pipeline
Western Stege Marsh Remediation
Western Stege Marsh Restoration
Westgard Shoulder Protection (09-38150)
West Navy Marsh
West Point Loma Marsh Restoration at Famosa Slough
West Portion of Rhode Island
West Sausal Lane PM 10.07
West Trail Living Shorelines Project
Wetland and Creek Restoration at Big Lagoon, Muir Beach
Wetland and Riparian Habitat Restoration (Wilmarth) (WCB ID:1997025)
Wetland Conservation Easement and Restoration Program, Conservation Reserve Enhancement Program (Traynham Ranch) (WCB ID:2002034)
Wetland Conservation Easement Program, Cherokee Farms (WCB ID:2001080)
Wetland Conservation Easement Program (Department of Fish and Game), CWC Ranch (Empire Tract) (WCB ID:1996024)
Wetland Conservation Easement Program (Department of Fish and Game)-Rancho Rio Oso, Expansion #1 (WCB ID:1997037)
Wetland Conservation Easement Program, Holmestead 2 (WCB ID:1994081)
Wetland Conservation Easement Program, Holmestead Farms #3 (WCB ID:1998078)
Wetland Conservation Easement Program, Holmestead Farms #4 (WCB ID:2009013)
Wetland Conservation Easement Program, Honcut Creek (Victor Ranch) (WCB ID:1994054)
Wetland Conservation Easement Program (Hughes Ranch) (WCB ID:2000097)
Wetland Conservation Easement Program, Joe Lares (WCB ID:1992039)
Wetland Conservation Easement Program, Klamath Land/Cattle (WCB ID:1992040)
Wetland Conservation Easement Program, McCorkle Ranch (WCB ID:1998079)
Wetland Conservation Easement Program, Mom's Farm (WCB ID:1995067)
Wetland Conservation Easement Program (Orme Ranch) (WCB ID:2000098)
Wetland Conservation Easement Program, Rancho Rio Chico (WCB ID:1994059)
Wetland Conservation Easement Program, Rancho Rio Oso (WCB ID:1995046)
Wetland Conservation Easement Program Restoration (Hughes Ranch) (WCB ID:2000110)
Wetland Conservation Easement Program Restoration (Orme Ranch) (WCB ID:2000109)
Wetland Conservation Easement Program, River Islands Farm (WCB ID:1998020)
Wetland Conservation Easement Program, Rudd Farms (WCB ID:2003285)
Wetland Conservation Easement Program, San Joaquin Wetland Farms, Expansion 1 (WCB ID:1994055)
Wetland Conservation Easement Program, San Joaquin Wetland Farms (WCB ID:1992041)
Wetland Conservation Easement Program, Senator Outing Duck Club (WCB ID:1993064)
Wetland Conservation Easement Program, Shively Ranch (WCB ID:1999037)
Wetland Conservation Easement Program, Skyraker Duck Club (WCB ID:1995068)
Wetland Conservation Easement Program, Yolo Basin Farms, Inc. (WCB ID:1993065)
Wetland Enhancement (BEE-ESS Properties) (WCB ID:1996046)
Wetland Enhancement (Modesto Properties) (WCB ID:1996047)
Wetland Habitat Restoration, 2017 Ranch (WCB ID:2001082)
Wetland Habitat Restoration (American Basin Farms) (WCB ID:1999068)
Wetland Habitat Restoration and Enhancement, (Santa Cruz Land and Cattle) (WCB ID:1998061)
Wetland Habitat Restoration (Bluebird Farms) (WCB ID:2000070)
Wetland Habitat Restoration (Brood Water and Wetland Enhancement, Phase II) (WCB ID:1999106)
Wetland Habitat Restoration (Butte Basin and Colusa Basin), Brady Ranch (WCB ID:2000106)
Wetland Habitat Restoration (Butte Basin and Colusa Basin), Butte Lodge Outing (WCB ID:2000103)
Wetland Habitat Restoration (Butte Basin and Colusa Basin), Circle 6 Ranch (WCB ID:2000102)
Wetland Habitat Restoration (Butte Basin and Colusa Basin), Colusa NWR (WCB ID:2000101)
Wetland Habitat Restoration (Butte Basin and Colusa Basin), Colusa NWR (WCB ID:2000104)
Wetland Habitat Restoration (Butte Basin and Colusa Basin), Davis Ranch (WCB ID:2000015)
Wetland Habitat Restoration (Butte Basin and Colusa Basin), Gray Lodge Wildlife Area, Water Delivery System (WCB ID:2000107)
Wetland Habitat Restoration (Butte Basin and Colusa Basin), Kingsley & Bolston Ranch (WCB ID:2000099)
Wetland Habitat Restoration (Butte Basin and Colusa Basin), Piper's Patch (WCB ID:2000105)
Wetland Habitat Restoration (Butte Basin and Colusa Basin), Steidlmayer Ranch (WCB ID:2000100)
Wetland Habitat Restoration (Butte Ranch) (WCB ID:2002082)
Wetland Habitat Restoration, Coast Cattle Ranch (WCB ID:2001140)
Wetland Habitat Restoration, Duck Slough, Flynn Ranch (WCB ID:2003303)
Wetland Habitat Restoration, East Grasslands (Duck Slough) (WCB ID:2001083)
Wetland Habitat Restoration, East Grasslands (San Felipe Ranch) (WCB ID:2001143)
Wetland Habitat Restoration, (Elworthy Brothers) (WCB ID:1997024)
Wetland Habitat Restoration (Four Mile Ranch) (WCB ID:1999069)
Wetland Habitat Restoration, Frog Pond (WCB ID:2004011)
Wetland Habitat Restoration, Holmestead Farms (WCB ID:2003359)
Wetland Habitat Restoration, Honcut Creek (McCorkle Ranch) (WCB ID:2001084)
Wetland Habitat Restoration, Joice Island Wildlife Area (WCB ID:2001145)
Wetland Habitat Restoration (Lakeview Farms) (WCB ID:1999107)
Wetland Habitat Restoration (Lincoln High School) (WCB ID:2002081)
Wetland Habitat Restoration (Little Dry Creek Farms) (WCB ID:2003045)
Wetland Habitat Restoration, Los Banos Wildlife Area, Mud Slough Unit (WCB ID:2003035)
Wetland Habitat Restoration, North Grasslands (Featherston) (WCB ID:2001184)
Wetland Habitat Restoration, North Grasslands (Lone Tree Ranch) (WCB ID:2002037)
Wetland Habitat Restoration, North Grasslands Wildlife Area, Gadwall Unit (WCB ID:2001085)
Wetland Habitat Restoration - North Pintail Slough Augmentation (WCB ID:2000073)
Wetland Habitat Restoration, North Pintail Slough (WCB ID:1998080)
Wetland Habitat Restoration (Provo) (WCB ID:2002084)
Wetland Habitat Restoration (Rancho Caleta) (WCB ID:2002112)
Wetland Habitat Restoration (Richins) (WCB ID:2000071)
Wetland Habitat Restoration (San Joaquin Wetland Farms) (WCB ID:2002078)
Wetland Habitat Restoration, South Grasslands (Britto Land and Investments) (WCB ID:2002077)
Wetland Habitat Restoration, South Grasslands (Redfern Ranch) (WCB ID:2003005)
Wetland Habitat Restoration, South Grasslands (Rooney Ranch) (WCB ID:2003006)
Wetland Habitat Restoration, Suisun Marsh (WCB ID:2002068)
Wetland Habitat Restoration, Volta Wildlife Area (WCB ID:2003034)
Wetland Habitat Restoration (Wallace Ranch) (WCB ID:2002036)
Wetland Habitat Restoration, Wingsetter Ranch (WCB ID:2001141)
Wetland Mitigation at Inglenook Fen - Ten Mile Dunes Natural Preserve
Wetland Reserve Program - Delta Property
Wetlands Habitat Restoration, East Grasslands (Castle Land and Cattle), Phase III (WCB ID:2001040)
Wetlands Habitat Restoration, South Grasslands (Britto Land Company, E.T.N., Inc. and Riverfield Cattle Company) (WCB ID:2001086)
Wetlands Habitat Restoration, Upper Butte Basin Wildlife Area, Little Dry Creek Unit (WCB ID:2001042)
Wetlands Regional Monitoring Program (WRMP)
Wet Meadow Restoration Project
Wet Weather Bypass Improvements
Whales Tail
Wharf J9 Replacement Project
Wheatville Farms Wetland Restoration (WCB ID:2003365)
Wheeler Island
Whipple Ave Mitigation
Whitehouse Pool Sediment Removal Project
White Slough
Whitethorn Grove Cleanup
Whitewater River Channel Concrete Slope (Palm Desert High School)
Whole Enchilada Curve Correction Project
Wildcat Creek Basin Sediment Removal
Wildcat Creek Marsh Restoration Project
Wildcat Creek Restoration
Wildcat Creek - San Pablo
Wilder Creek Restoration Project
Wilder Project
Wilder Ranch State Park Baldwin Creek Estuary Restoration
Wilder Ranch State Park Lombardi Creek Revegetation
Wildlife Corridors for Flood Escape on the Yolo Bypass Wildlife Area
Wildomar Channel Stage 5
Wilkie Creek Stewardship Project
Williamson River Floodplain Reconnection
Willits Bypass Project - Benbow 007-010-04
Willits Bypass Project - Benbow 007-020-03
Willits Bypass Project - Benbow 108-020-06
Willits Bypass Project - Benbow 108-030-07
Willits Bypass Project - Benbow 108-040-13
Willits Bypass Project - Brooke 038-020-11
Willits Bypass Project - Brooke 038-040-09
Willits Bypass Project - Brooke 108-020-03
Willits Bypass Project - Brooke 108-030-01
Willits Bypass Project - Ford 108-010-05
Willits Bypass Project - Ford 108-010-06
Willits Bypass Project - Ford 108-020-04
Willits Bypass Project - Ford 108-030-02
Willits Bypass Project - Ford 108-030-05
Willits Bypass Project - Frost 108-07-04
Willits Bypass Project - Frost 108-70-04
Willits Bypass Project - Goss 103-230-02
Willits Bypass Project - Lusher 103-30-04
Willits Bypass Project - Lusher 108-30-03
Willits Bypass Project - MGC Plasma Middle 103-250-14
Willits Bypass Project - MGC Plasma North 103-230-06
Willits Bypass Project - Nance 108-50-06
Willits Bypass Project - Niesen 108-40-02
Willits Bypass Project - Watson 037-221-30
Willits Bypass Project - Wildlands 108-03-08
Willits Bypass Project - Wildlands 108-060-02
Willits Bypass Project - Wildlands 108-070-08
Willits Bypass Project - Wildlands 108-070-09
Willits Bypass Project - Wildlands 108-20-07
Willits Bypass Project - Wildlands 108-60-01
Willow Bend (WCB ID:2015024)
Willow Creek
Willows Road Bridge Geotechnical Drilling Project
Willows Wetland Park Construction
Wilson Ranch Meadow Restoration
Windsor Veteran's Village
Windy Springs Meadow Restoration
Wing Levee Road Preserve
Wings Landing Tidal Habitat Restoration Project
Winter Island Tidal Habitat Restoration Project
Wire Mountain Vernal Pool Fill
Wohn Hunting Club
Wolf Creek Channel Maintenance
Woodbridge Ecological Reserve Habitat Enhancement
Woodbridge Ecological Reserve Habitat Enhancement (WCB ID:1998047)
Woodland Regional Park Habitat Enhancement (WCB ID:2018053)
Wood River Riparian Fencing
Woodruff Creek and Tributaries Crossings Rehabilitation Project
Wood to Steel Project - TL 637
Yellow Creek Mainstem
Yellow Creek Tributary YC02
Yolo Basin Farms, Inc.
Yolo Bypass Wildlife Area
Yolo Bypass Wildlife Area, Expansion 1 (WCB ID:1994024)
Yolo Bypass Wildlife Area, Expansion 2 (WCB ID:1994060)
Yolo Bypass Wildlife Area, Expansion 3 (WCB ID:2001146)
Yolo Bypass Wildlife Area, Expansion 4 (WCB ID:2001151)
Yolo Bypass Wildlife Area, Expansion 5 (WCB ID:2002069)
Yolo Bypass Wildlife Area, Expansion 6 (WCB ID:2003313)
Yolo Bypass Wildlife Area Fireman's Unit Wetland Enhancement (WCB ID:2008029)
Yolo Bypass Wildlife Area Habitat and Drainage Improvement Project
Yolo Bypass Wildlife Area (WCB ID:1991040)
Yolo Bypass Wildlife Area Wetland Restoration (WCB ID:2007030)
Yolo Flyway Farms Tidal Habitat Restoration
Yon Cove Residential Development, RIV
York Avenue Rattlesnake Creek Channel Bank Repair
Yosemite Slough Restoration Project
Younger Lagoon Restoration
Yountville Inn Expansion and Workforce Housing Project
Yuba Drive Mitigation Preserve
Yucca Loma Road/Yates Road/Green Tree Blvd Phase I Improvements Project, San Bernardino County, CA
Yulupa Creek Crossing - 2017 Nuns Fire Restoration
Zanker Farm Restoration Project: Phase I and II
Zanker Road Landfill Mitigation Site
Zinfandel Lane Fish Passage Project
Zinfandel Lane Fish Passage Project (Version 1)
Zone 12 Line J Flood Control Channel (Lion Creek) Restoration Project
Zone 12 Lines H, J, and K Sediment Removal Project
Zone 12 Lines I Maintenance Sediment Removal Project, City of Oakland
Zone 2 Line C Flood Control Channel from Line A to East 14th Street
Zone 3A Line A Sediment Improvement Project From I-880 to Southern Pacific Railroad
Zone 4 Line A Flood Control Channel Improvements Between Line E and Cabot Blvd.
Zone 4 Line A Improvements Between Cabot Blvd. and UPRR
Zone 5 Line D Creek Restoration
Zone6 Line C Channel Bank Repair Project
Zone 6 Line E Bank Failure Repair Upstream of Fremont Boulevard
Zone IV Pile Repair/Replacement
Zuma Canyon Restoration and Steelhead Enhancement
Habitat projects are on-the-ground efforts such as ecological restoration, mitigation, and land management practices that change the distribution or abundance of wetland or aquatic resources.